FIR04-00376
| INSP-Conference | 11/8/2010 | 11/15/2010 | 11/19/2010 12:06:16 PM | A | DONE |
|
|
Follow up conference with Lee. I was able to contact Mark Caprye with Oxarc and he stated that they now have a local technician and he would work with me on getting their multiple outstanding permits finaled.
|
FIR04-00375
| INSP-Conference | 11/8/2010 | 11/15/2010 | 11/19/2010 12:05:41 PM | A | DONE |
|
|
Follow up conference with Lee. I was able to contact Mark Caprye with Oxarc and he stated that they now have a local technician and he would work with me on getting their multiple outstanding permits finaled.
|
FIR04-00374
| INSP-Conference | 11/8/2010 | 11/15/2010 | 11/19/2010 12:04:41 PM | A | DONE |
|
|
Follow up conference with Lee. I was able to contact Mark Caprye with Oxarc and he stated that they now have a local technician and he would work with me on getting their multiple outstanding permits finaled.
|
FIR08-00550
| FIR-Aging Inspection | 11/15/2010 | 11/15/2010 | 11/17/2010 2:51:44 PM | | NR |
|
|
Mike stated that this should be set up for inspection the week after Thanksgiving.
|
FIR09-00081
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 3:42:45 PM | P | CANC |
|
|
Per discussion with Guy this inspection will be rescheduled for tomorrow.
|
FIR09-00407
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 3:42:09 PM | P | CANC |
|
|
Per discussion with Guy this inspection will be rescheduled for tomorrow.
|
FIR09-00051
| FIR-Aging Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 3:34:32 PM | | NR |
|
|
Taylor Brothers has contacted me about finishing the outstanding General FIre permits which would include this one.
|
FIR09-00110
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 3:22:06 PM | P | PASS |
|
|
Permit finaled
|
FIR09-00082
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 3:18:34 PM | P | FAIL |
|
|
After arriving on site it was determined that this permit will be postponed due to a plan modification being performed to include additional fire alarm work.
|
FIR09-00013
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 2:32:25 PM | P | PASS |
|
|
Permit finaled
|
BLD09-00962
| FIRE-Conference | 11/12/2010 | 11/15/2010 | 11/15/2010 1:36:30 PM | A | DONE |
|
|
I left address and permit information on both Mark Sentenno's and Scott Arellano's voice mails.
|
FIR10-00505
| INSP-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 1:31:58 PM | P | PASS |
|
|
Permit finaled. Rand to supply accurate as-builts, a map at the facp and NFPA 72 record of completion form signed by the property owner at tomorrows life safety inspection.
|
FIR10-00400
| INSP-Final Inspection | 11/12/2010 | 11/15/2010 | 11/15/2010 1:29:24 PM | A | PASS |
|
|
Permit finaled. Bill to provide test papers and sticker on outside alarm bell as discussed for tomorrows life safety inspection.
|
FIR10-00400
| INSP-Sprinkler Rough-in/Hydro | 11/12/2010 | 11/15/2010 | 11/15/2010 1:27:06 PM | A | PASS |
|
|
The remaining overhead hydro tests passed.
|
BLD10-02420
| FIRE-Final Inspection | 11/12/2010 | 11/15/2010 | 11/15/2010 8:55:54 AM | A | PASS |
|
|
life safety passed
|