BLD11-02059
| FIRE-Conference | 11/14/2011 | 11/15/2011 | 1/24/2012 12:11:31 PM | A | DONE |
|
|
Regarding coverage at the ATM room.
|
FIR11-00504
| INSP-Final Inspection | 11/14/2011 | 11/15/2011 | 11/16/2011 4:47:33 PM | P | PASS |
|
|
|
FIR11-00538
| INSP-Final Inspection | 11/14/2011 | 11/15/2011 | 11/16/2011 4:47:09 PM | P | PASS |
|
|
|
FIR11-00301
| INSP-Sprinkler Rough-in | 11/14/2011 | 11/15/2011 | 11/15/2011 3:14:00 PM | A | PART |
|
|
UG fire supply line and remote FDC piping at the SE corner okayed to bury. Note: contractor has utilized a restrained joint system per NFPA 13 10.8.3 in place of thrust blocking. Discussed bury depth requirements with contractor per civil drawing elevations- UG pipe to be maintained 4'6" below grade min.
|
FIR11-00534
| INSP-Supply line flush | 11/11/2011 | 11/15/2011 | 11/15/2011 3:02:46 PM | P | PART |
|
|
UG fire supply line flush completed acceptable.
|
FIR10-00524
| INSP-Final Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 3:01:43 PM | P | PASS |
|
|
Inspection passed. Fire alarm permit finaled.
|
FIR11-00528
| INSP-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 3:00:21 PM | A | FAIL |
|
|
See plan annotations for noted items including notification appliance coverage and location issues, missing SD at the three liebert units, batteries at the FACP, etc.
|
FIR11-00397
| INSP-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 10:32:12 AM | A | DEFR |
|
|
Don Phone #: ###-####
|
BLD10-02929
| FIRE-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 10:31:09 AM | A | PASS |
|
|
Correction items verified for completion. Signature card not available at the time of inspection. Life safety finaled.
|