BLD11-02336
| FIRE-Final Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 3:13:53 PM | P | PASS |
|
|
life safety passed
|
FIR11-00570
| INSP-Final Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 2:56:04 PM | P | PASS |
|
|
permit finaled
|
BLD11-01527
| FIRE-Final Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 2:28:15 PM | A | FAIL |
|
|
Need the insulation that is blocking the upright sprinkler heads repaired and the overspaced sprinklers and pendant sprinklers with no ceilings addressed.
|
BLD11-02634
| FIRE-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 2:18:07 PM | A | FAIL |
|
|
See the upper level and lower level approved floor plans for a list of corrections that need addressed. They include modified sprinkler coverage missing exit signs and missing occupant load sign.
|
FIR11-00579
| INSP-Sprinkler Rough-in | 11/14/2011 | 11/15/2011 | 11/15/2011 11:54:43 AM | A | PASS |
|
|
First and second floor hard lid areas are ok to cover. I noted that the sprinkler protection provided over the main entry canopy has not been installed. Mike is going to have his office contact me on this.
|
FIR11-00544
| INSP-Sprinkler Rough-in/Hydro | 11/14/2011 | 11/15/2011 | 11/15/2011 11:11:41 AM | A | PASS |
|
|
Rough-in passed. One pendant needs to be relocated in the Laundry room and as-builts showing the revised pipe routing are needed. The tenting still needs to be done.
|
BLD11-02211
| FIRE-Final Inspection | 11/14/2011 | 11/15/2011 | 11/15/2011 11:04:40 AM | A | FAIL |
|
|
Provide emergency lighting in the break room as per the plans.
|
BLD11-00389
| FIRE-Final Inspection | 11/15/2011 | 11/15/2011 | 11/15/2011 10:23:35 AM | P | PASS |
|
|
life safety passed
|
BLD11-02165
| FIRE-Conference | 11/15/2011 | 11/15/2011 | | P | |
|
|
|