Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00738 BMP Violation11/13/201211/15/201211/15/2012 4:17:10 PMPFAIL
Final notice:
Curbing should in place on 11/16/2012. Curbing barrier is a acceptable barrier for sediment control. Prio to placing the curbing, the ashpalt must be clean and free of all sediment. Explained to the RP that above ground inlet protection (gator gaurds) are not a accepted protection if curbing is not poured due to the foam type material and in not being weighted down adaquitely and there are gaps underneeth the gator gaurd thaty could allow sediment laiden water could migrate in those gaps if water is used for cleaning of the ashalt of if potental rain events occur. Will re-inspect on 11/16/2012 for sediment barriers. If barriers are not in place, a Stop work Order will be issued.
ESC12-00475 Aging Inspection11/15/201211/15/201211/15/2012 3:40:27 PM PASS
working on driveway.
ESC11-00884 General Inspection11/15/201211/15/201211/15/2012 3:12:41 PM PASS
ESC12-00644 General Inspection11/15/201211/15/201211/15/2012 2:42:48 PM FAIL
Verbal to RP:
Maintain perimeter sediment controls at bottom of slope. Will re-inspect on 11/16/2012
ESC12-00588 Aging Inspection11/15/201211/15/201211/15/2012 2:34:14 PM PASS
ESC12-00528 Aging Inspection11/15/201211/15/201211/15/2012 2:09:06 PM PASS
ESC12-00910 Site Final11/14/201211/15/201211/15/2012 1:58:52 PMPPASS
Mark Phone #: ###-####
ESC12-00429 Aging Inspection11/15/201211/15/201211/15/2012 1:13:49 PM DONE
Permit finaled
ESC12-00429 DOC - Permit Finaled11/15/201211/15/201211/15/2012 1:13:28 PMPPASS
ESC11-00678 General Inspection11/15/201211/15/201211/15/2012 11:37:09 AM PART
site is under vertical construction but not all area have become active.
ESC12-00842 General Inspection11/15/201211/15/201211/15/2012 11:36:13 AMAFAIL
Verbal to RP:
Provide protection to the storm drains within the two exsisting streets that have project has connected to. "Will follow up om 11/16/2012
ESC11-00261 General Inspection11/15/201211/15/201211/15/2012 11:34:29 AM PASS
No activity seen
ESC12-00600 Aging Inspection11/15/201211/15/201211/15/2012 8:42:01 AM DONE
Permit finaled.
ESC12-00600 DOC - Permit Finaled11/15/201211/15/201211/15/2012 8:41:50 AMPPASS
ESC12-00429 DOC - Permit Finaled11/15/201211/15/201211/15/2012 8:39:41 AMPPASS