Inspections for the day of: Friday, November 15, 2013.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-03160 Electrical Rough-In11/13/201311/15/201311/15/2013 4:41:09 PMANH
Phone #: ###-#### >> Inspection requested via web by Mark M Unable to meet up with general foreman due to scheduling conflicts.
ELE13-03137 Electrical Rough-In11/14/201311/15/201311/15/2013 4:35:52 PMPPASS
>> Inspection requested via web by Terry Scott garage and rooms over garage rough in ok cover
ELE13-03101 Final11/14/201311/15/201311/15/2013 4:10:06 PMPFAIL
If no one is there the lockbox is 6360, please let me know if there are any issues. Thank You.
Clay Phone #: ###-#### >> Inspection requested via web by Clay Morgan 210.62-Showroom receptical outlet ahall be installed with in 18" of window
ELE13-02057 Electrical Rough-In11/15/201311/15/201311/15/2013 3:53:55 PMPPASS
Robert. 6th floor wall cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy 6th floor wall rough in ok cover
ELE13-02788 Final11/14/201311/15/201311/15/2013 3:26:47 PMPCANC
Contact: Josh Mangum Phone #: ###-#### >> Inspection requested via web by Deb Gooden Rescheduled to monday the 18th
ELE13-03100 Final11/15/201311/15/201311/15/2013 3:21:09 PMPFAIL
please call so I can let you into the home Phone #: ###-#### >> Inspection requested via web by Eddy Udry 110.26- A flat platform 30" wide and 36" deep shall be provided in front of service for work space.
ELE13-03100 Permanent Service11/15/201311/15/201311/15/2013 3:10:54 PMPPASS
please call so I can let you into the home Phone #: ###-#### >> Inspection requested via web by Eddy Udry p/s o/h rec ok
ELE13-02449 Electrical Rough-In11/15/201311/15/201311/15/2013 1:45:15 PMPPASS
Potting for light inspection please_Mike Phone #: ###-#### UL listing confirmed. Rough in ok cover
ELE13-03004 Electrical Rough-In11/15/201311/15/201311/15/2013 1:11:42 PMPPASS
floor heat insp// Dennis (homeowner call for acces) -- (Mike, contractor ###-####) Phone #: ###-#### Floor heat rough in ok cover
ELE13-03197 Electrical Rough-In11/14/201311/15/201311/15/2013 12:47:23 PMAPASS
Tricky to find, call for info.
Thanks Richard Phone #: ###-#### >> Inspection requested via web by Richard Floor heat home runs in floor rough in ok cover
ELE13-01478 Final11/15/201311/15/201311/15/2013 12:19:13 PMAPASS
please call before arriving. I need to make sure homeowner is there to let you in. Thank You Phone #: ###-#### >> Inspection requested via web by Eric Brown Final ok
ELE12-01710 Permanent Service11/14/201311/15/201311/15/2013 10:59:31 AMAPART
Contact: Wes Powell Phone #: ###-#### >> Inspection requested via web by Deb Gooden Fire pump, and generator rough in ok
ELE13-03195 Electrical Rough-In11/14/201311/15/201311/15/2013 9:16:04 AMAPASS
Master bath remodel Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot Rough in ok cover
ELE13-01051 Electrical Rough-In11/14/201311/15/201311/15/2013 8:52:45 AMAPASS
Bruce Phone #: ###-#### Service rough in ok
ELE13-01051 Permanent Service11/15/201311/15/201311/15/2013 8:52:18 AMPPASS
Bruce Phone #: ###-#### p/s o/h n ok
ELE13-03191 Electrical Rough-In11/14/201311/15/201311/15/2013 8:45:11 AMAPASS
rough in for cover on the new framed walls Phone #: ###-#### >> Inspection requested via web by Brad Baker Wall rough in ok cover
ELE13-02983 Electrical Rough-In11/14/201311/15/201311/14/2013 3:26:44 PMAPASS
michael - floor heat inspection Phone #: ###-#### rough in ok cover