FIR13-00595
| INSP-Final Inspection | 11/12/2013 | 11/15/2013 | 11/18/2013 3:56:54 PM | P | PART |
|
|
Fire alarm work passed functional testing with the exception of missing trouble signal at the SD above the panel upon removal of the smoke head- To be repaired as discussed.
|
BLD13-02535
| FIRE-Final Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 4:14:58 PM | A | PASS |
|
|
Scope of permit work completed. Life safety passed.
|
FIR13-00616
| INSP-Sprinkler Rough-in/Hydro | 11/15/2013 | 11/15/2013 | 11/15/2013 4:14:00 PM | P | PASS |
|
|
Hood suppression system functioned correctly under test conditions. Permit finaled.
|
FIR13-00507
| INSP-Final Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 4:12:12 PM | P | PASS |
|
|
Scope of work completed. Fire sprinkler permit okayed for final.
|
BLD13-03095
| FIRE-Final Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 11:28:18 AM | A | NH |
|
|
justin Phone #: ###-#### * Phoned contact- left message
|
FIR13-00352
| INSP-Final Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 11:15:45 AM | A | PART |
|
|
Fire sprinkler work at the new warehouse area passed overhead inspection. Discussed light fixture locations with respect to sprinkler head coverage with electrical contractor. Final pending lacking coverage above the hall ceiling adjacent to the secure storage room where the deck sprinklers will be obstructed.
|