ESC13-01161
| Site Preparation | 11/15/2013 | 11/15/2013 | 11/15/2013 4:32:12 PM | P | PASS |
|
|
Contractor/RP Kevin requested inspection by phone and explained scope of project.
Garage to be added next to alley. Low risk site. BMPs include: 1. Concrete washout container 2. ESC permit posted 3. Daily housekeeping/sweeping for any trackout
Approved.
|
ESC12-00403
| General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 4:08:52 PM | | PASS |
|
|
No dewatering or dewatering equipment observed at time of inspection. Called Hoffman contact Noelle to discuss dewatering plans and status of project, she was not available. Will update upon talking to her.
No corrections at this time.
|
ESC13-00755
| Site Preparation | 11/15/2013 | 11/15/2013 | 11/15/2013 3:32:07 PM | P | PASS |
|
|
jc Phone #: ###-####
All surrounding DI have filter bags installed. West, south, and east of site has trenched in silt fencing. Controlled access to construction area with single construction entrance at roundabout at Lysted and Arrow Junction. Site will be surrounded by chain link fence to protect equipment and BMPs. Site is ready for costruction. SWPPP, ESCP, and CGP permits were available for review. Approved.
|
ESC13-00793
| Site Preparation | 11/15/2013 | 11/15/2013 | 11/15/2013 3:23:53 PM | P | PASS |
|
|
jc Phone #: ###-####
Met with JC and Preston from Petra. Laydown site is to be used for stockpiling, equipment storage, and jobsite trailer. Construction entrance installed. Site has perimeter silt fencing and pre-existing man-made berms to contain runoff. Silt fence is fully trenched in. Approved for construction activity.
|
ESC13-00839
| General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 2:35:44 PM | | PASS |
|
|
No acitivity at time of inspection. Project is not yet complete. ESC permit is posted, all work contained within backyard. No ESC violations observed.
|
ESC13-00013
| BMP Violation | 11/14/2013 | 11/15/2013 | 11/15/2013 1:21:46 PM | A | PASS |
|
|
RP called saying corrections will be complete by Friday afternoon.
Reinspection Friday @ 1:20. Gutter has been swept and shoveled.
|
ESC13-00855
| General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 11:19:37 AM | | PASS |
|
|
WIP. Permit posted. Perimeter wattles installed. No corrections at this time.
|
ESC13-00377
| Aging Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 10:55:23 AM | | PASS |
|
|
Permit finaled. See notes
|
ESC13-00377
| DOC - Permit Finaled | 11/15/2013 | 11/15/2013 | 11/15/2013 10:54:52 AM | P | PASS |
|
|
Project is complete and stabilized. No construction materials left on site. BLD permit has been finaled. No further ESC inspections required.
|
ESC11-00732
| General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 10:31:41 AM | | PASS |
|
|
CGP 2008 permit issued in 2011 is now expired and was not found in CGP 2012 eNOI database. Permit # ID10CP57
Greenbelt realignment is complete, no further construction activity at this time. Some bank areas are in process of vegetation/stabilization.
Will walk through on next inspection; no corrections at this time.
|
ESC13-00259
| BMP Violation | 11/14/2013 | 11/15/2013 | 11/15/2013 10:05:46 AM | A | PASS |
|
|
Clint from Tahoe Homes (2 active sites) will place wattles at foot of silt fence. Existing stormwater trench with check dams will capture majority of runoff.
Clint stated fences are to keep contractors/public from driving on and off lots. Crew will install wattles at low spots and sweep roads.
Will check for corrections next inspection in Triplett Ranch.
|
ESC11-00525
| BMP Violation | 11/14/2013 | 11/15/2013 | 11/15/2013 9:29:55 AM | A | PART |
|
|
Check DI bags, sidewalks and washout conditions
Inspection notes: Corrections completed: 1. DI bags have been repaired/replaced 2. Sidewalks have been swept (in coordination with Brighton Homes) 3. New washout has been provided.
Not complete:
1. Washout needs lining before use 2. Provide rock entrance to washout pit to prevent trackout.
|
ESC13-00230
| General Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 9:15:12 AM | | PASS |
|
|
Subdivision BMPs in good condition. Central area has been hydroseeded and is also to be used for stockpiling - construction entrance provided. Fencing and landscaping appears to be complete. Brighton Homes has just started the first home in Phase 5. Concrete washout <25% full.
No corrections at this time.
|
ESC13-01096
| Site Preparation | 11/14/2013 | 11/15/2013 | 11/15/2013 9:05:26 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
Site is ready for excavation. West side of lot is downslope and is a landscaped berm that will act as a buffer. BMPs:
1.Washout provided for subdivision 2. Construction entrance for excavators, with boards to protect curbing 3. Permit posted 4. Drop inlets have filter protection
Approved
|
ESC13-00013
| Site Preparation | 11/14/2013 | 11/15/2013 | 11/14/2013 4:46:56 PM | A | CANC |
|
|
wrong inspection type
|