Inspections for the day of: Tuesday, November 15, 2016.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-02982 Final11/15/201611/15/201611/15/2016 3:39:31 PMPFAIL
Call Tom for final walk down of Garage. Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- Some general purpose receptacle outlets not working due to damage from construction. 1 circuit showed open neutral.
300.4- Flex connector cover on transformer T-DPAMPH missing. Exposed wiring subfect to physical damage.
300.15(A)- LB covers shall remain accessible after installation. Main level LB fitting 1/2 covered in concrete.
426.11- Grease tank in parking garage wrapped with heat trace cable shall have a barrier to protect from physical damage.
ELE16-01838 Conference11/15/201611/15/201611/15/2016 3:39:05 PMPDONE
Discussed with Brandon if temp occupancy could be granted to Annex 4th floor kitchen area. Explained all core and shell areas of building must be complete. All wiring shall be in an enclosure or box and shall not be subject to physical damage. All that is complete shall be tested.
ELE16-01838 Final11/15/201611/15/201611/15/2016 3:05:15 PMPFAIL
Level 9 TI POWER Partial Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- Office 935-3 needs trimmed, open boxes, drywall repair in progress.
400.8- Flexible cords shall not penetrate ceilings. Flexible cords run from 9th floor to roof and in stairways.
605.5- Furniture connections shall be complete. Most have covers and receptacles missing. Furniture whips laying on floor with ends taped.
ELE16-03712 Electrical Rough-In11/15/201611/15/201611/15/2016 1:09:45 PMPPASS
Phone #: ###-#### Inspection requested via web by steve ragan
wall rough in ok cover
ELE16-03353 Electrical Rough-In11/14/201611/15/201611/15/2016 10:51:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Mark M
Accelerator control room walls rough in ok cover
ELE16-03696 Rough-In Permanent Service11/14/201611/15/201611/15/2016 10:30:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Charles Davis
Rough in ok cover p/s u/g n ok
ELE16-03554 Rough-In Permanent Service11/14/201611/15/201611/15/2016 9:55:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn
Rough in ok cover p/s u/g n ok
ELE16-03555 Rough-In Permanent Service11/15/201611/15/201611/15/2016 9:24:57 AMAPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn
Rough in ok cover p/s u/g n ok
ELE16-03665 Electrical Rough-In11/14/201611/15/201611/15/2016 8:50:00 AMAPASS
Ok to cover interior, overhead service not finished till siders finish. Phone #: ###-#### Inspection requested via web by Robert Schroder
Rough in ok cover