BLD16-04076
| FIRE-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 2:28:01 PM | P | PASS |
|
|
life safety passed.
|
FIR16-00336
| INSP-Sprinkler Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 2:26:51 PM | P | FAIL |
|
|
I pointed out several locations where tenting needed modified which included in the Master Bedroom and a vertical piece of pipe on the second floor above the Master Bedroom. Also a letter is needed that states the spray on foam insulation is compatible with the cpvc piping. I noted that the spray on foam has been sprayed behind as well as on top fo the piping. The building contractor, Bob, stated that there is adequate insulation behind the piping and the foam on the interior side of the piping is not detrimental to heat transfer. Another cover inspection is needed with the above corrections prior to covering the piping.
|
NAF16-00057
| INSP-Sprinkler Rough-in/Hydro | 11/14/2016 | 11/15/2016 | 11/15/2016 12:04:44 PM | A | FAIL |
|
|
Overhead hydro tests failed due to visible leak on the ground and pressure loss at the guages. I also noted that the supply piping to the FDC needs hydro tested.
|
FIR16-00677
| INSP-Sprinkler Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 9:41:02 AM | A | FAIL |
|
|
The pendant heads in the Sales area exceed 130 sq. ft. for max. coverage.
|