MIS16-00032
| MIS-Aging Inspection | 11/15/2016 | 11/15/2016 | 11/16/2016 9:19:44 AM | | DEFR |
|
|
|
MIS16-00190
| MIS-Aging Inspection | 11/15/2016 | 11/15/2016 | 11/16/2016 9:17:56 AM | | PASS |
|
|
|
BLD16-03700
| BLD-Conference | 11/14/2016 | 11/15/2016 | 11/15/2016 4:46:46 PM | P | CANC |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD16-03700
| BLD-Framing/Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 4:38:11 PM | P | NR |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane. Needs plumbing rough in inspection.
|
ESC16-01402
| Site Preparation | 11/15/2016 | 11/15/2016 | 11/15/2016 3:56:51 PM | P | PASS |
|
|
|
BLD16-03771
| BLD-Footing | 11/14/2016 | 11/15/2016 | 11/15/2016 3:56:28 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
ESC16-01283
| Site Preparation | 11/15/2016 | 11/15/2016 | 11/15/2016 3:35:57 PM | P | PASS |
|
|
|
BLD16-03401
| BLD-Footing | 11/14/2016 | 11/15/2016 | 11/15/2016 3:35:45 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-02948
| BLD-Footing | 11/15/2016 | 11/15/2016 | 11/15/2016 2:53:58 PM | P | PART |
|
|
Jason Phone #: ###-####. Work in progress. Will have special inspection.
|
BLD15-04514
| BLD-Final | 11/15/2016 | 11/15/2016 | 11/15/2016 2:14:47 PM | P | PASS |
|
|
John Phone #: ###-####. Ok for perm occ.
|
BLD16-01288
| BLD-Final | 11/15/2016 | 11/15/2016 | 11/15/2016 2:02:38 PM | P | FAIL |
|
|
Call half hour before to meet // Ferris Phone #: ###-####. 20 minute door to be selg closing, handrails need to return back to wall.
|
BLD15-01393
| BLD-Framing/Rough-in | 11/15/2016 | 11/15/2016 | 11/15/2016 1:48:29 PM | P | FAIL |
|
|
Shell Framing Final Phone #: ###-#### Inspection requested via web by Mike McHargue. Complete all lateral bracing. Nail off 2ply B02 truss per the engineering. Provide additional studs underB03 truss, both ends. Provide squash blocks at A13 truss both ends. Install the simpson A34 on all trusses per detail 6 on S1.5. Need electrical rough in inspection and airseal pack on exterior walls. Correction notice was posted.
|
BLD16-03260
| BLD-Final | 11/14/2016 | 11/15/2016 | 11/15/2016 11:09:07 AM | A | PEND |
|
|
Devin Phone #: ###-####. Needs to mount vertical grab bar at correct location (exceeds the 41" max from rear wall). Also noted several pieces of machining equipment tha thas ben moved in and wired. Per scope of work, this is a vanilla shell permit only, and no occupancy is allowed under this permit. Noted to ESI super to either have the existing permit modifed or have new tenants submit plans for occupancy. Noted that nothing has been submitted thus far for occupancy. Will final this permit when new tenant has submitted plans to planning and zoning for review.
|
GCB15-00090
| GCB-Ceiling Grid | 11/14/2016 | 11/15/2016 | 11/15/2016 10:08:34 AM | A | PASS |
|
|
Chris ###-#### - requests call ahead. Grid ceiling, 2nd. floor apartment ok.
|
BLD16-03726
| BLD-Conference | 11/11/2016 | 11/15/2016 | 11/15/2016 9:30:45 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith
|
BLD16-03726
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 9:30:35 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD16-03021
| BLD-Framing/Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 9:01:25 AM | A | PASS |
|
|
Rudolph Phone #: ###-####
|
BLD16-03242
| BLD-Conference | 11/15/2016 | 11/15/2016 | 11/15/2016 8:36:26 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Discussed phased inspections for framing and UL listings for 1hr. room.
|