Inspections for the day of: Tuesday, November 15, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01465 FIRE-Final Inspection11/14/201611/15/201611/15/2016 3:53:43 PMAPASS
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, property has a knox box. Final life fire safety inspection complete.
FIR15-00705 INSP-Final Inspection11/15/201611/15/201611/15/2016 3:42:37 PMPPART
Final fire sprinkler inspection for levels 3 & 4 of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
FIR16-00402 INSP-Final Inspection11/15/201611/15/201611/15/2016 3:42:01 PMPPART
Final fire sprinkler inspection for level 5 and greenhouse of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
FIR15-00602 INSP-Final Inspection11/15/201611/15/201611/15/2016 3:41:18 PMPPART
Final fire sprinkler inspection for levels 1 & 2 of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
FIR15-00198 INSP-Alarm Testing11/15/201611/15/201611/15/2016 3:38:51 PMPDONE
Alarm testing complete for smokes and in-ducts for annex, fire sprinkler flow and tamper switches tested and passed, level 4 flow switch needs to be replaced and retested.
BLD12-01330 FIRE-Final Inspection11/15/201611/15/201611/15/2016 3:37:34 PMPCANC
Inspection request rescheduled for 16NOV2016
FIR16-00305 INSP-Sprinkler Rough-in/Hydro11/14/201611/15/201611/15/2016 1:12:26 PMAPART
Rough to cover inspectio for overhead fire sprinkler piping located above the ceiling grid on level 2 complete, overhead fire sprinkler piping located above ceiling grid on level 2 spproved for cover. Partial tenting inspection for fire sprinkler piping located on level 6 complete, notated city approved drawings areas approved for cover.
FIR16-00054 INSP-Sprinkler Rough-in/Hydro11/15/201611/15/201611/15/2016 12:18:25 PMAPASS
Underground supply hydrostatic test complete
FIR16-00162 INSP-Sprinkler Rough-in11/14/201611/15/201611/15/2016 11:43:47 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in requested area complete, noted city approved drawings with pink highlighter/red ink area's approved for cover.
FIR16-00678 INSP-Final Inspection11/15/201611/15/201611/15/2016 11:42:21 AMPCANC
Inspection request reschedule per conversation with Richard, ###-####
FIR16-00585 INSP-Final Inspection11/15/201611/15/201611/15/2016 7:52:20 AMAPASS
Final inspection was completed on 09NOV2016
FIR15-00727 INSP-Final Inspection11/15/201611/15/201611/15/2016 7:50:20 AMAPASS
Pemit finaled
FIR15-00751 INSP-Final Inspection11/15/201611/15/201611/15/2016 7:49:57 AMAPASS
Permit finaled