BLD16-01465
| FIRE-Final Inspection | 11/14/2016 | 11/15/2016 | 11/15/2016 3:53:43 PM | A | PASS |
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, property has a knox box. Final life fire safety inspection complete.
|
FIR15-00705
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:42:37 PM | P | PART |
|
|
Final fire sprinkler inspection for levels 3 & 4 of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
|
FIR16-00402
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:42:01 PM | P | PART |
|
|
Final fire sprinkler inspection for level 5 and greenhouse of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
|
FIR15-00602
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:41:18 PM | P | PART |
|
|
Final fire sprinkler inspection for levels 1 & 2 of annex complete. FIR permit will stay in issued status (Partial final for records) until BLD permit is ready to be finaled on life fire safety, at time of life fire safety completion FIR permit will be finaled as well.
|
FIR15-00198
| INSP-Alarm Testing | 11/15/2016 | 11/15/2016 | 11/15/2016 3:38:51 PM | P | DONE |
|
|
Alarm testing complete for smokes and in-ducts for annex, fire sprinkler flow and tamper switches tested and passed, level 4 flow switch needs to be replaced and retested.
|
BLD12-01330
| FIRE-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:37:34 PM | P | CANC |
|
|
Inspection request rescheduled for 16NOV2016
|
FIR16-00305
| INSP-Sprinkler Rough-in/Hydro | 11/14/2016 | 11/15/2016 | 11/15/2016 1:12:26 PM | A | PART |
|
|
Rough to cover inspectio for overhead fire sprinkler piping located above the ceiling grid on level 2 complete, overhead fire sprinkler piping located above ceiling grid on level 2 spproved for cover. Partial tenting inspection for fire sprinkler piping located on level 6 complete, notated city approved drawings areas approved for cover.
|
FIR16-00054
| INSP-Sprinkler Rough-in/Hydro | 11/15/2016 | 11/15/2016 | 11/15/2016 12:18:25 PM | A | PASS |
|
|
Underground supply hydrostatic test complete
|
FIR16-00162
| INSP-Sprinkler Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 11:43:47 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in requested area complete, noted city approved drawings with pink highlighter/red ink area's approved for cover.
|
FIR16-00678
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 11:42:21 AM | P | CANC |
|
|
Inspection request reschedule per conversation with Richard, ###-####
|
FIR16-00585
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:52:20 AM | A | PASS |
|
|
Final inspection was completed on 09NOV2016
|
FIR15-00727
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:50:20 AM | A | PASS |
|
|
Pemit finaled
|
FIR15-00751
| INSP-Final Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:49:57 AM | A | PASS |
|
|
Permit finaled
|