ELE19-03911
| Electrical Rough-In | 11/14/2019 | 11/15/2019 | 11/15/2019 2:31:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot Back area Sub panel,Refer, Dish/disp, misc. counter receps and small office area.
|
ELE19-03324
| Electrical Rough-In | 11/15/2019 | 11/15/2019 | 11/15/2019 1:26:24 PM | P | PASS |
|
|
ceiling inspection Corrections made Ceiling ok to cover
|
ELE19-00108
| Electrical Rough-In | 11/15/2019 | 11/15/2019 | 11/15/2019 12:46:53 PM | P | PASS |
|
|
Unit 303 Floor Heat Contact Craig Timmons Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Floor heat only ok to cover
|
ELE19-04224
| Final | 11/15/2019 | 11/15/2019 | 11/15/2019 11:55:35 AM | P | PASS |
|
|
Jose Phone #: ###-#### Final ok
|
ELE19-04396
| Final | 11/15/2019 | 11/15/2019 | 11/15/2019 11:50:47 AM | A | PASS |
|
|
Final electrical inspection in conjunction with Old Dominion final solar inspection.
Thank you ; have a great day! Phone #: ###-#### final ok
|
ELE19-04400
| Final | 11/14/2019 | 11/15/2019 | 11/15/2019 11:49:27 AM | A | PASS |
|
|
homeowner will be home and is leaving the garage door open for access to the electric panel. Plans are at the inverter which is behind the gate which will be propped open for you. Phone #: ###-#### Inspection requested via web by Matt Oranday final ok
|
ELE19-01482
| Final | 11/14/2019 | 11/15/2019 | 11/15/2019 10:42:58 AM | A | PART |
|
|
Final electrical inspection needed for roof and exterior Please call Jared with any questions. Phone #: ###-#### Inspection requested via web by Angela Stears Partial only. Exterior light is up, Unit 104 Mini split has a 15A max ocpd. 20A installed. Partial final ok (Note: HVAC contractor had been trouble shooting problems in Mini spit rooftop units. Many cover for lowvolt connections were missing screws.)
|
ELE19-04368
| Final | 11/13/2019 | 11/15/2019 | 11/15/2019 10:12:23 AM | A | PASS |
|
|
Contact: Matt Cinko Phone #: ###-#### Inspection requested via web by Deb Gooden exterior Hose bib heater in Greyhound bus area. final ok
|
ELE19-03701
| Final | 11/14/2019 | 11/15/2019 | 11/15/2019 9:50:35 AM | A | PASS |
|
|
Request by Miguel with amp electric Phone #: ###-#### Inspection requested via web by Greg Traudt final ok
|
ELE19-04414
| Rough-In Permanent Service | 11/14/2019 | 11/15/2019 | 11/15/2019 9:17:08 AM | A | PASS |
|
|
Please contact me when done Phone #: ###-#### Inspection requested via web by Thomas wilson Underground ok p/s u/g n ok
|
ELE19-04400
| Final | 11/14/2019 | 11/15/2019 | 11/14/2019 11:38:23 AM | A | CANC |
|
|
Homeowner will be there on site with garage open. Plans are at the inverter next to meter, behind the gate (which is open). United electric did electrical tie in and they will have a final today as well Phone #: ###-#### >> Inspection requested via web by Matt Oranday Inspection cancelled from web by: Matt Oranday
|