ELE19-04200
| Electrical Rough-In | 11/13/2019 | 11/15/2019 | 11/15/2019 2:50:42 PM | P | CANC |
|
|
I will be changing the main panel starting after the power is disconnected (9:30AM). later in the day would be better. Thanks! Phone #: ###-#### Inspection requested via web by david Macdoanld...needed p/s inspection
|
ELE19-04200
| Permanent Service | 11/15/2019 | 11/15/2019 | 11/15/2019 2:50:18 PM | P | PASS |
|
|
I will be changing the main panel starting after the power is disconnected (9:30AM). later in the day would be better. Thanks! Phone #: ###-#### Inspection requested via web by david Macdoanld... p/s u/g reconnect ok
|
ELE19-04206
| Electrical Rough-In | 11/15/2019 | 11/15/2019 | 11/15/2019 2:41:49 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt...UL listinf verified on equipment
|
ELE19-04175
| Electrical Rough-In | 11/15/2019 | 11/15/2019 | 11/15/2019 1:40:30 PM | P | PASS |
|
|
Storefront Phone #: ###-#### Inspection requested via web by Bryan McLaughlin... ok to cover access to junction box check at final...LF side front entry
|
ELE19-04409
| Electrical Rough-In | 11/14/2019 | 11/15/2019 | 11/15/2019 11:35:33 AM | P | PASS |
|
|
underslab conduits for kitchen islands Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover bldg H
|
ELE19-02836
| Final | 11/15/2019 | 11/15/2019 | 11/15/2019 11:11:42 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Angela Stears...ok to final
|
ELE19-04323
| Permanent Service | 11/15/2019 | 11/15/2019 | 11/15/2019 11:01:47 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jamie berg... underground from pedistal to home covered at time of inspection...contractor taking responsibility for depth...grounding verified p/s u/g new ok
|
ELE19-03965
| Final | 11/15/2019 | 11/15/2019 | 11/15/2019 10:42:47 AM | A | PASS |
|
|
Please call first Phone #: ###-#### Inspection requested via web by James Munn... disconnect and GFCI protection verified...ok to final
|
ELE19-04275
| Final | 11/11/2019 | 11/15/2019 | 11/15/2019 10:07:53 AM | A | PASS |
|
|
Ashley is the on site contact Phone #: ###-#### Inspection requested via web by BRS Permitting...labelling, disconnect, and OCPD ok
|
ELE18-04746
| Electrical Rough-In | 11/14/2019 | 11/15/2019 | 11/15/2019 9:39:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... grid ok...minus front entry hallway-LV needs off grid...future inspection required
|
ELE15-03283
| ELE-Aging Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 8:56:07 AM | | FAIL |
|
|
contractor has been notified disregarding notification no attempt to schedule inspection to verify corrections have been made
|
ELE19-03765
| Final | 11/14/2019 | 11/15/2019 | 11/15/2019 8:49:18 AM | A | PASS |
|
|
Requesting Electrical Final for Health and Welfare. Thanks Tim Phone #: ###-#### Inspection requested via web by Tim Lawrence... ok to final...phase 1 future phases will require new permit
|
ELE19-04412
| Final | 11/14/2019 | 11/15/2019 | 11/15/2019 8:28:45 AM | A | PASS |
|
|
Do along with Mechanical inspection 8AM
You can reach her if you have any questions at ###-####. Her name is Shauna. Thank you! Phone #: ###-#### Inspection requested via web by Tricia Henderson...ok to final
|