Inspections for the day of: Friday, November 15, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00748 INSP-Supply line flush11/14/201911/15/201911/15/2019 3:28:15 PMPPASS
The underground supply piping is ok for cover.

troy nelson
u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR19-00752 INSP-Supply line flush11/14/201911/15/201911/15/2019 3:27:43 PMPCANC
troy nelson
u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR19-00760 INSP-Sprinkler Rough-in11/14/201911/15/201911/15/2019 2:01:07 PMPPASS
Rough-in passed. Piping can be covered.

mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR19-00353 INSP-Sprinkler Rough-in11/15/201911/15/201911/15/2019 1:25:56 PMPPASS
The 2" corridor piping on the third and fourth floors has had the earth quake bracing installed. The sprinkler piping in the fourth floor corridor soffits can be covered. Phone #: ###-#### Inspection requested via web by jeremiah robison
BLD19-04246 FIRE-Final Inspection11/15/201911/15/201911/15/2019 12:26:12 PMPPASS
Life safety passed.

Jason Phone #: ###-####
FIR19-00848 INSP-Final Inspection11/15/201911/15/201911/15/2019 12:25:44 PMPPASS
Permit finaled

JASON Phone #: ###-####
NAF19-00103 INSP-Final11/14/201911/15/201911/15/2019 12:25:11 PMPDONE
permit finaled

Please call Kevin prior to heading out so he can meet you out there. Phone #: ###-#### Inspection requested via web by Sam Ball
NAF19-00110 INSP-Supply line flush11/14/201911/15/201911/15/2019 11:13:20 AMAPASS
The underground supply line flush was witnessed.

troy nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
BLD19-01885 FIRE-Final Inspection11/15/201911/15/201911/15/2019 9:27:47 AMPPASS
Life safety passed. Phone #: ###-#### Inspection requested via web by Ron Goff
BLD19-01885 FIRE-Alarm Testing11/14/201911/15/201911/15/2019 8:02:49 AMAFAIL
I called the contact three times but was unable to leave a message due to the mail box being full. I went to job site but can not gain access through the FAA controled gate. No inspection performed. Also alarm testing must be scheduled with the FIR permit not the building permit.

Phone #: ###-#### Inspection requested via web by Ron Goff
BLD19-01885 FIRE-Final Inspection11/14/201911/15/201911/15/2019 8:02:01 AMAFAIL
I called the contact three times but was unable to leave a message due to the mail box being full. I went to job site but can not gain access through the FAA controled gate. No inspection performed.

Phone #: ###-#### Inspection requested via web by Ron Goff
BLD19-02650 FIRE-Final Inspection11/14/201911/15/201911/15/2019 7:35:57 AMACANC
Not ready per contact.

call 20 minutes before // maureen Phone #: ###-####