| INSP-Supply line flush | 11/14/2019 | 11/15/2019 | 11/15/2019 3:28:15 PM | P | PASS |
|
|
The underground supply piping is ok for cover.
troy nelson u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR19-00752
| INSP-Supply line flush | 11/14/2019 | 11/15/2019 | 11/15/2019 3:27:43 PM | P | CANC |
|
|
troy nelson u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR19-00760
| INSP-Sprinkler Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 2:01:07 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR19-00353
| INSP-Sprinkler Rough-in | 11/15/2019 | 11/15/2019 | 11/15/2019 1:25:56 PM | P | PASS |
|
|
The 2" corridor piping on the third and fourth floors has had the earth quake bracing installed. The sprinkler piping in the fourth floor corridor soffits can be covered. Phone #: ###-#### Inspection requested via web by jeremiah robison
|
BLD19-04246
| FIRE-Final Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 12:26:12 PM | P | PASS |
|
|
Life safety passed.
Jason Phone #: ###-####
|
FIR19-00848
| INSP-Final Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 12:25:44 PM | P | PASS |
|
|
Permit finaled
JASON Phone #: ###-####
|
NAF19-00103
| INSP-Final | 11/14/2019 | 11/15/2019 | 11/15/2019 12:25:11 PM | P | DONE |
|
|
permit finaled
Please call Kevin prior to heading out so he can meet you out there. Phone #: ###-#### Inspection requested via web by Sam Ball
|
NAF19-00110
| INSP-Supply line flush | 11/14/2019 | 11/15/2019 | 11/15/2019 11:13:20 AM | A | PASS |
|
|
The underground supply line flush was witnessed.
troy nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
BLD19-01885
| FIRE-Final Inspection | 11/15/2019 | 11/15/2019 | 11/15/2019 9:27:47 AM | P | PASS |
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Ron Goff
|
BLD19-01885
| FIRE-Alarm Testing | 11/14/2019 | 11/15/2019 | 11/15/2019 8:02:49 AM | A | FAIL |
|
|
I called the contact three times but was unable to leave a message due to the mail box being full. I went to job site but can not gain access through the FAA controled gate. No inspection performed. Also alarm testing must be scheduled with the FIR permit not the building permit.
Phone #: ###-#### Inspection requested via web by Ron Goff
|
BLD19-01885
| FIRE-Final Inspection | 11/14/2019 | 11/15/2019 | 11/15/2019 8:02:01 AM | A | FAIL |
|
|
I called the contact three times but was unable to leave a message due to the mail box being full. I went to job site but can not gain access through the FAA controled gate. No inspection performed.
Phone #: ###-#### Inspection requested via web by Ron Goff
|
BLD19-02650
| FIRE-Final Inspection | 11/14/2019 | 11/15/2019 | 11/15/2019 7:35:57 AM | A | CANC |
|
|
Not ready per contact.