BLD99-01835
| BLD-Framing/Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | FAIL |
|
|
mark ###-#### reinspection Fire C/N.
|
BLD99-01835
| BLD-Energy code compliance | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | FAIL |
|
|
mark ###-#### C/N not done.
|
MEC99-03612
| Final | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 15:35:15. Contact: ###-####. Done #411
|
MEC99-03874
| Final | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | FAIL |
|
|
Dick Mccarol Done #411.
|
BLD99-03281
| BLD-Footing | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 16:48:55. Contact: ###-####. That ready is not done- ie. Rebar tails still in dirt, contractor confrontational, attempted to prevent me from leaving.
|
BLD98-00686
| BLD-Final | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | A | PASS |
|
|
grey ###-#### C/C issued.
|
BLD99-00420
| BLD-Framing/Rough-in | 11/16/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | P | FAIL |
|
|
BOB ###-#### FR INSP Truss engineering, point leads & BCEC.
|
BLD99-02255
| BLD-Final | 11/16/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | P | PASS |
|
|
|
MEC99-03829
| Final | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 13:15:32. Contact: ###-####. Ran out of daylight- called to have inspection rescheduled.
|
BLD98-03573
| BLD-Framing/Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | P | FAIL |
|
|
ALLAN ###-#### TJF installation or engineered fix required.
|
BLD99-03032
| BLD-Framing/Rough-in | 11/12/1999 | 11/16/1999 | 11/16/1999 12:00:00 AM | P | PASS |
|
|
kathleen ###-#### Energy ok also.
|