MIS00-00279
| BLD-Conference | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | A | FAIL |
|
|
Complaint of shed construction in rear of yard w/out permits.325.stop work isued 11/16/2000 8:34:29 AM
|
BLD00-01628
| BLD-Framing/Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | A | CANC |
|
|
shear dante' ###-####-- PER DANTE CANCEL
|
BLD00-01628
| BLD-Framing/Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | A | FAIL |
|
|
shear dante' ###-####
|
BLD00-01827
| BLD-Other | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:28:39. Contact: .
|
BLD00-01783
| BLD-Other | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 301 On 11/16/2000 9:51:05 AM c/n to hold all cost at north east corner of bldg do to resubmital to maintane 60 ft set back . resubmital routed with p//z, pw/planreview.
|
BLD00-01628
| BLD-Framing/Rough-in | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | PART |
|
|
DANTE ###-#### FR sheer ok letter with plans for staples vs naills. 11/16/2000 4:22:06 PM
|
BLD00-02240
| BLD-Final | 11/13/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | PART |
|
|
###-#### tenp ok /ele temp/bathroom hardware single action. 11/16/2000 4:45:41 PM
|
BLD00-02989
| BLD-Foundation | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 11:53:41. Contact: ###-####. walls ok 11/16/2000 10:10:06 AM
|
BLD00-01563
| BLD-Concrete | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:13. Contact: ###-####. placed with special inspection pending report. 11/16/2000 4:12:01 PM
|