Inspections for the day of: Thursday, November 16, 2000.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-03858 Groundwork11/15/200011/16/200011/16/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/15/2000 at 11:55:50. Contact: ###-####. lower end up to the first bathroom group and western bathroom group 11/15/2000 4:29:24 PM
PLM00-03951 Water and/or Sewer11/15/200011/16/200011/16/2000 12:00:00 AMAFAIL
JOHN ###-#### SWR & WATER did this one yesterday afternoon 11/15/2000 2:45:48 PM 11/15/2000 2:46:15 PM
PLM00-03945 Final11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
###-#### Aubrey
PLM00-03956 Final11/15/200011/16/200011/16/2000 12:00:00 AMANR
October permit for piping not linked to a building permit. ###-#### just picked up permit noone called for an inspection 11/17/2000 3:56:47 PM
PLM00-02169 Water and/or Sewer11/15/200011/16/200011/16/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/15/2000 at 16:15:40. Contact: ###-####. , tests ok, hallway by restrooms r/i ok julery ri ok 11/16/2000 9:41:45 AM 11/16/2000 9:57:00 AM
PLM00-03670 Groundwork11/15/200011/16/200011/16/2000 12:00:00 AMAFAIL
Scheduled by Inspector: 330 On 11/15/2000 hme depot test failed 11/16/2000 11:55:32 AM
PLM00-03232 Plumbing Rough-in11/15/200011/16/200011/16/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/15/2000 at 16:34:34. Contact: ###-####. incomplete will recall 11/16/2000 10:23:57 AM
PLM00-03784 Final11/16/200011/16/200011/16/2000 12:00:00 AMAPASS
Added by Inspector: 330 On 11/16/2000 final ok
PLM00-03323 Water and/or Sewer11/16/200011/16/200011/16/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 11/16/2000 sewer line rerout ok
PLM00-03324 Water and/or Sewer11/16/200011/16/200011/16/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 11/16/2000 sewer line rerout ok
PLM00-03436 Final11/16/200011/16/200011/16/2000 12:00:00 AMPPASS
FN-- BILL-- ###-####
PLM00-03958 Final11/16/200011/16/200011/16/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/16/2000 at 09:07:11. Contact: ###-####. repipe ice maker drain ice bin drain must not tie to other drain lines and must terminate at floor sink with an air gap. temp occ ok 11/16/2000 2:01:16 PM
PLM00-03360 Final11/16/200011/16/200011/16/2000 12:00:00 AMPFAIL
Ken ###-####the key is on the side porch underneath a brick on the side porch remove water heater flex below floor on t&p drain, 4" waste must be run from 4" waste riser to 4" building sewer. 11/16/2000 3:05:23 PM
PLM00-03670 Groundwork11/16/200011/16/200011/16/2000 12:00:00 AMPFAIL
Scheduled by Inspector: 330 On 11/16/2000 test failed 11/16/2000 2:17:25 PM