Inspections for the day of: Thursday, November 16, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02857 BLD-Framing/Rough-in11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
fr insp jake ###-####
MEC00-03976 Rough-in11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
###-####
MEC00-03976 Pressure Test11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
MEC00-03951 Rough-in11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
f/p shane ###-####
MEC00-03977 Pressure Test11/15/200011/16/200011/16/2000 12:00:00 AMAPASS
PRES TEST-- DEANNA- ###-####
BLD00-02003 BLD-Final11/15/200011/16/200011/16/2000 12:00:00 AMANH
Larry Chase ###-#### locked out.left note to recall. 11/16/2000 12:00:35 PM
BLD00-02616 BLD-Framing/Rough-in11/16/200011/16/200011/16/2000 12:00:00 AMPPART
FR TERRY ###-#### c/n. 11/16/2000 1:43:16 PM
BLD00-02637 BLD-Energy code compliance11/16/200011/16/200011/16/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/16/2000 at 10:48:37. Contact: .ok to insulate,foam seal ok. no frame c/ns. 11/16/2000 1:39:24 PM
BLD00-03129 BLD-Footing11/16/200011/16/200011/16/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/16/2000 at 11:11:29. Contact: ###-####.
MEC00-03967 Final11/16/200011/16/200011/16/2000 12:00:00 AMPPASS
Added by Inspector: 407 On 11/16/2000
BLD00-02543 BLD-Footing11/15/200011/16/200011/16/2000 12:00:00 AMPPART
###-#### needs compaction report. 11/17/2000 9:05:50 AM
BLD00-01063 BLD-Framing/Rough-in11/15/200011/16/200011/16/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/15/2000 at 14:04:58. Contact: ###-####.