BLD99-02856
| FIRE-Hydro test above ground | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 15:15:39. Contact: ###-####./////hydro okay only 11/16/2000 3:59:40 PM
|
FIR00-00123
| INSP-Sprinkler Rough-in/Hydro | 11/15/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 15:21:25. Contact: ###-####.////// this inspection not ready 11/16/2000 3:58:59 PM
|
BLD00-01913
| FIRE-Final Inspection | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | NR |
|
|
DON PAGER ###-#### FIRE FN // not ready will reschedule 11/16/2000 3:58:31 PM
|
FIR99-00669
| INSP-Sprinkler Rough-in/Hydro | 11/16/2000 | 11/16/2000 | 11/16/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 409 On 11/16/2000 4:00:25 PM ///not complete 11/16/2000 4:00:53 PM
|