Inspections for the day of: Wednesday, November 16, 2005.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00199 FIR-Final11/16/200511/16/200511/17/2005 10:09:24 AMPFAIL
Need to provide current inspection tags for the fire extinguishers, provide current annual inspection on the fire sprinkler system.
FIR05-00453 INSP-Final Inspection11/15/200511/16/200511/16/2005 4:37:58 PMPCANC
###-#### - grant Note: after 3:00 pm after school Cancel inspection per phone conversation, schedules for inspection time did not correlate. To be completed at a later date.
FIR05-00335 INSP-Alarm Testing11/16/200511/16/200511/16/2005 4:25:38 PMPDONE
Inspection scheduled to determine status of permit.
BLD05-02396 FIRE-Final Inspection11/16/200511/16/200511/16/2005 4:23:14 PMPPASS
Fire life safety passed inspection.
FIR05-00592 INSP-Final Inspection11/15/200511/16/200511/16/2005 4:21:58 PMPFAIL
One hanger at armover above room adjacent to the break room is overspaced.
FIR05-00591 INSP-Final Inspection11/16/200511/16/200511/16/2005 4:20:34 PMPFAIL
The hanger on one armover is overspaced, one head at column is not installed as shown on plans-however it appears to be superfluous per the required spacing of 168 sq. ft. which is met without the head.
BLD05-01980 FIRE-Alarm Testing11/16/200511/16/200511/16/2005 3:56:37 PMPPASS
Fire life safety passed inspection.
FIR05-00726 INSP-Final Inspection11/15/200511/16/200511/16/2005 2:43:16 PMPPART
Overhead sprinkler work is complete and satisfactory, final pending shell sprinker final approval.
FIR05-00681 INSP-Sprinkler Rough-in/Hydro11/15/200511/16/200511/16/2005 2:41:25 PMPFAIL
Hydrostatic test not completed due to leakage per contractor.
FIR05-00681 INSP-Final Inspection11/15/200511/16/200511/16/2005 2:40:24 PMPNR
This permit is not ready for final at this time.
FIR05-00681 INSP-Sprinkler Rough-in11/15/200511/16/200511/16/2005 2:39:32 PMPFAIL
One head is overspaced as circled on plans, one head is too close to a heat diffuser for the supplied temp rating, need canopies and tile and hydrostatic test pre final.
FIR05-00688 INSP-Final Inspection11/15/200511/16/200511/16/2005 2:36:16 PMAPART
Sprinkler work is satisfactory, final pending final approval of shell sprinkler permit.
FIR05-00694 INSP-Final Inspection11/15/200511/16/200511/16/2005 2:34:38 PMAPART
Final pending resubmittals showing added heads under ductwork and shell sprinkler final approval.
MIS05-00212 FIR-Final11/15/200511/16/200511/16/2005 11:30:06 AMAFAIL
Provide an additional fire extinguisher for the seating area, remove two surface bolts at the back doors as discussed, repair emergency light at front counter.
BLD05-02730 FIRE-Final Inspection11/15/200511/16/200511/16/2005 11:06:22 AMAPASS
Fire life safety passed inspection, alarm and sprinkler permits are finaled.
FIR05-00332 INSP-Sprinkler Rough-in11/15/200511/16/200511/16/2005 10:39:08 AMAPART
Basement kitchen area rough-in is good for cover.
FIR05-00765 INSP-Sprinkler Rough-in11/15/200511/16/200511/16/2005 9:59:06 AMAPART
Overhead rough-in is acceptable to cover, will final when ceiling tile and escutcheons are installed and paper/tape is removed from all heads.
BLD05-02938 FIRE-Final Inspection11/15/200511/16/200511/16/2005 9:25:12 AMAPASS
Items on correction notice have been completed, fire life safety passed inspection.
FIR05-00694 INSP-Sprinkler Rough-in/Hydro11/15/200511/16/200511/16/2005 8:42:33 AMACANC
Duplicate inspection already called in.
FIR05-00668 INSP-Final Inspection11/15/200511/16/200511/16/2005 8:40:59 AMAPASS
Hood suppression system operated correctly under test conditions.
FIR05-00686 INSP-Final Inspection11/16/200511/16/200511/16/2005 12:00:00 AMAPASS
Fire alarm permit finaled.