Inspections for the day of: Wednesday, November 16, 2005.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS05-00110 MIS-Aging Inspection11/16/200511/16/200511/21/2005 4:36:46 PM CANC
FIR05-00569 INSP-Sprinkler Rough-in/Hydro11/15/200511/16/200511/17/2005 7:42:10 AMPPART
Hydro test for the first floor piping passed. First floor rough-in passed.
FIR05-00589 INSP-Final Inspection11/15/200511/16/200511/17/2005 7:41:39 AMAFAIL
Need to provide verification of battery backup for the dialer/HUB
FIR05-00210 INSP-Alarm Testing11/15/200511/16/200511/16/2005 3:38:19 PMAFAIL
Sample tubes are incorrect. The holes in the tubes as installed are 10" apart. Per Mark at Silent Knight tech support the holes on the 2.5 should be 2" o. c. and the 5.0 and 10.0 should be 3" o.c.
FIR05-00716 INSP-Final Inspection11/15/200511/16/200511/16/2005 10:44:16 AMAFAIL
harry; Phone #: ###-#### A sprinkler armover at the rear door has been hung from electrical conduit. Take to building structure. Insulation is falling from the deck and obstructing the upright sprinklers. This will need to be repaired. Pendant heads through out the space are exceed the max 130sq. ft spacing. Fix it. I would have marked locations on the plans had 1/2 of the floor plan not be missing.
BLD05-01392 FIRE-Final Inspection11/15/200511/16/200511/16/2005 10:22:56 AMAPASS
Life safety finaled