Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00639 INSP-Sprinkler Rough-in11/16/200611/16/200611/17/2006 5:17:18 PMPPART
Need to provide correct as-builts reflecting actual installation of overhead piping for the 3rd floor previous to approval for cover.
FIR06-00680 INSP-Alarm Testing11/13/200611/16/200611/16/2006 3:47:47 PMAPASS
Fire alarm work passed final inspection.
FIR06-00320 INSP-Final Inspection11/16/200611/16/200611/16/2006 3:46:43 PMPPART
UG flush completed, need to install missing head in the basement hall, calc. stickers, lock control valves open, provide annual inspection tag.
FIR05-00425 INSP-Sprinkler Rough-in11/15/200611/16/200611/16/2006 12:50:51 PMAPART
Retest of the OH hydrostatic for the 6th floor passed inspeciton.
BLD06-02391 FIRE-Final Inspection11/15/200611/16/200611/16/2006 11:33:54 AMAPASS
Life safety is satisfactory, inspection passed.
BLD06-00501 FIRE-Final Inspection11/15/200611/16/200611/16/2006 11:32:40 AMAPASS
Life safety inspection passed, per contractor signage at the fire lane curbs to be completed pending rain delay.
FIR06-00534 INSP-Sprinkler Rough-in/Hydro11/13/200611/16/200611/16/2006 10:51:30 AMAFAIL
Pendent head in office 305 is overspaced off an adjacent wall, head in the mechanical closet is partially blocked and installed too close to adjacent ductwork.
FIR06-00826 INSP-Final Inspection11/15/200611/16/200611/16/2006 10:46:36 AMANR
Per contractor, project inspection pending interconnection of the access controlled egress door to the fire alarm system.
BLD06-01581 FIRE-Final Inspection11/15/200611/16/200611/16/2006 9:47:23 AMAPASS
c/n item has been completed, fire life safety passed final inspection.