BLD05-02329
| FIRE-Final Inspection | 11/15/2006 | 11/16/2006 | 11/17/2006 11:32:44 AM | A | PASS |
|
|
Life safety finaled. Doors have been corrected.
|
BLD05-02328
| FIRE-Final Inspection | 11/15/2006 | 11/16/2006 | 11/17/2006 11:32:20 AM | A | PASS |
|
|
Life safety finaled. Doors have been corrected.
|
BLD05-01690
| FIRE-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 8:06:33 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00468
| INSP-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 3:44:05 PM | P | FAIL |
|
|
Still need to address the different sprinkler heads. K factors are different and the anti-freeze solution needs to be verified.
|
BLD06-01672
| FIRE-Final Inspection | 11/15/2006 | 11/16/2006 | 11/16/2006 12:55:06 PM | P | CANC |
|
|
to be rescheduled
|
FIR06-00866
| INSP-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 12:54:26 PM | P | FAIL |
|
|
existing insulation is hanging down and blocking coverage. All other items are ok
|
BLD06-03007
| FIRE-Final Inspection | 11/16/2006 | 11/16/2006 | 11/16/2006 11:21:10 AM | P | PART |
|
|
A temporary occupancy was given with dave hannimans permission until the new door and related hardware are installed. Need to remove or repair the exit signs and tag the extinguisher.
|
BLD05-03026
| FIRE-Final Inspection | 11/15/2006 | 11/16/2006 | 11/16/2006 10:44:37 AM | P | PASS |
|
|
Life safety finaled
|
BLD05-02880
| FIRE-Conference | 11/15/2006 | 11/16/2006 | 11/16/2006 9:52:56 AM | A | PASS |
|
|
The owners representative wanted me to ok their new layout to meet the sprinkler analasis. They are reinstalling the racks starting in the northwest corner. They are providing 6" transverse and longitudinal flu spaces with 48" isles. This meets the intent of the letter and if carried out will be approved by me.
|