PLM07-03822
| Plumbing Rough-in | 11/15/2007 | 11/16/2007 | 11/16/2007 3:58:49 PM | P | PASS |
|
|
Randy, please call 1 hr. prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
MEC07-04052
| Final | 11/15/2007 | 11/16/2007 | 11/16/2007 3:39:00 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
MEC07-03405
| Pressure Test | 11/16/2007 | 11/16/2007 | 11/16/2007 3:09:44 PM | P | PASS |
|
|
Key is on the left side of the back door about a foot off the ground. Any questions please call Mike Phone #: ###-#### Internet Inspection Request from: Doramus Cassi 20# test ok.
|
MEC07-03405
| Rough-in | 11/16/2007 | 11/16/2007 | 11/16/2007 3:09:18 PM | P | FAIL |
|
|
Key is on the left side of the back door about a foot off the ground. Any questions please call Mike Phone #: ###-#### Internet Inspection Request from: Doramus Cassi terminate secondary drain for attic furnace outside over a door or a window. 20# test ok.
|
MEC07-04013
| Final | 11/16/2007 | 11/16/2007 | 11/16/2007 2:37:22 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Josh Blake
|
MEC07-04023
| Final | 11/16/2007 | 11/16/2007 | 11/16/2007 2:22:32 PM | P | PASS |
|
|
###-#### Phone #: ###-#### Internet Inspection Request from: Bill Burch
|
MEC07-04056
| Pressure Test | 11/16/2007 | 11/16/2007 | 11/16/2007 2:13:33 PM | P | FAIL |
|
|
If at all possible, early afternoon inspection. Please call Phil with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Colleen Brown test failed
|
MEC07-02288
| Final | 11/15/2007 | 11/16/2007 | 11/16/2007 12:10:05 PM | A | PASS |
|
|
dean Phone #: ###-####
|
PLM07-02352
| Final | 11/16/2007 | 11/16/2007 | 11/16/2007 12:08:49 PM | P | PASS |
|
|
dean Phone #: ###-####
|
MEC07-02963
| Final | 11/15/2007 | 11/16/2007 | 11/16/2007 11:46:02 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 5:01:26 PM. Contact: ###-####.
|
MEC07-02962
| Final | 11/15/2007 | 11/16/2007 | 11/16/2007 11:45:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 5:01:01 PM. Contact: ###-####.
|
MEC07-04079
| Final | 11/15/2007 | 11/16/2007 | 11/16/2007 9:57:42 AM | A | FAIL |
|
|
penny Phone #: ###-#### elevate all sources of ignation ( blower motor) 18" above the garage floor.
|
MEC06-04208
| Final | 11/13/2007 | 11/16/2007 | 11/16/2007 9:13:13 AM | A | PASS |
|
|
jodi - 2210 owyhee only Phone #: ###-####
|
MEC07-01996
| MEC-Aging Inspection | 11/16/2007 | 11/16/2007 | 11/16/2007 9:03:37 AM | | PASS |
|
|
wip
|
MEC07-01955
| MEC-Aging Inspection | 11/16/2007 | 11/16/2007 | 11/16/2007 9:02:37 AM | | PASS |
|
|
|
MEC07-01953
| MEC-Aging Inspection | 11/16/2007 | 11/16/2007 | 11/16/2007 9:02:25 AM | | PASS |
|
|
wip
|
MEC07-04060
| Pressure Test | 11/15/2007 | 11/16/2007 | 11/16/2007 9:01:25 AM | A | PASS |
|
|
andy Phone #: ###-#### gas line outside from meter to back side of the garage, 20# test ok.
|