Inspections for the day of: Monday, November 16, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00479 Site Preparation11/16/200911/16/200911/17/2009 12:35:29 PMPFAIL
need BMPs
BLD09-02014 BLD-Framing/Rough-in11/16/200911/16/200911/16/2009 6:10:56 PMPFAIL
jake Phone #: ###-####
need trades.. need a frame conf
BLD09-01270 BLD-Footing11/16/200911/16/200911/16/2009 5:48:28 PMPPASS
chris Phone #: ###-####
BLD08-01426 BLD-Conference11/16/200911/16/200911/16/2009 3:36:23 PMPPART
on site conf w/ tenant,, called landlord, Christy,, ###-####, she will call for inspections
BLD09-01855 BLD-Framing/Rough-in11/16/200911/16/200911/16/2009 3:15:13 PMPPASS
Ryan-Please call at least 20 mins prior to inspection so he can meet ya there Phone #: ###-####
ok to insulate,, need fire blocks
BLD09-00887 BLD-Framing/Rough-in11/12/200911/16/200911/16/2009 2:28:51 PMAPART
rob Phone #: ###-####
some interior walls,, ok pending trades r/in,,, siesmic ties in roof on So. end,, other ties ok pend engineer letter of ok
BLD09-01636 BLD-Conference11/13/200911/16/200911/16/2009 1:47:50 PMANH
someone called in to see if they got a permit and said the work was already done. There were no inspections done.
BLD09-01985 BLD-Framing/Rough-in11/13/200911/16/200911/16/2009 1:17:28 PMAPART
Larry Phone #: ###-####
frame ok,, no electrical at this point
BLD09-00710 BLD-Conference11/12/200911/16/200911/16/2009 11:47:53 AMAPART
Ernie Phone #: ###-####
VERIFY EXT CHANE WAS APPROVED
wip ,, will take in changes for approval
BLD09-02037 BLD-Footing11/13/200911/16/200911/16/2009 9:45:47 AMAPART