Inspections for the day of: Wednesday, November 16, 2011.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02165 FIRE-Conference11/15/201111/15/2011 P 
BLD11-02692 FIRE-Final Inspection11/15/201111/16/201111/17/2011 2:43:12 PMPFAIL
Jamie Phone #: ###-#### Need to provide sprinkler coverage in the vault/safe. All other items are ok.
FIR11-00594 INSP-Sprinkler Rough-in11/15/201111/16/201111/16/2011 3:25:56 PMPPASS
Sprinkler piping can be covered.
FIR11-00544 INSP-Sprinkler Rough-in11/15/201111/16/201111/16/2011 2:35:33 PMAPASS
The underground supplt piping is ok to bury
BLD11-02165 FIRE-Conference11/16/201111/16/201111/16/2011 2:33:15 PMADONE
Fire sprinkler modifications will be addressed by john
BLD11-01527 FIRE-Conference11/15/201111/16/201111/16/2011 1:54:10 PMADONE
Todd and I discussed the insulation/obstructions to the sprinkler heads. Fire sprinkler modifications will be addressed by the Subway tenant sprinkler contractor.
BLD11-02701 FIRE-Final Inspection11/15/201111/16/201111/16/2011 9:09:22 AMAPASS
life safety passed