ESC11-00034
| Aging Inspection | 11/16/2011 | 11/16/2011 | 11/16/2011 6:36:12 PM | | PART |
|
|
Have initiated stabilizetion on all of the disturbed areas. Waiting on a uniformed coverage of established vegatation.
|
ESC09-00507
| General Inspection | 11/16/2011 | 11/16/2011 | 11/16/2011 6:32:42 PM | | PART |
|
|
No activity. Still keeping the site in compliance. Still need to provide stabilization measure on portions of the driveway going down to Starcrest. But temporary BMP's still in place and in working conditions.
|
ESC11-00184
| General Inspection | 11/16/2011 | 11/16/2011 | 11/16/2011 4:57:27 PM | | PASS |
|
|
|
ESC11-00749
| Site Preparation | 11/16/2011 | 11/16/2011 | 11/16/2011 2:41:44 PM | P | PART |
|
|
Verbal to RP: Provide storm drain inlet protection within the parking by the trash container. Will follow up on 11/18/2011
|
ESC10-00882
| General Inspection | 11/16/2011 | 11/16/2011 | 11/16/2011 8:15:34 AM | | DONE |
|
|
No activity
|