Inspections for the day of: Wednesday, November 16, 2016.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01139 FIRE-Final Inspection11/15/201611/16/201611/16/2016 3:32:00 PMPPASS
Life fire safety passed/complete
BLD16-03715 FIRE-Final Inspection11/15/201611/16/201611/16/2016 1:38:47 PMAPASS
Final fire sprinkler inspection complete, no modifications to fire alarm system, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection passed/complete.
FIR16-00677 INSP-Final Inspection11/16/201611/16/201611/16/2016 1:37:32 PMPPASS
Final fire sprinkler inspection passed/complete
FIR16-00677 INSP-Sprinkler Rough-in11/16/201611/16/201611/16/2016 1:33:30 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping complete, overhead fire sprinkler piping approved for cover.
BLD15-04153 FIRE-Final Inspection11/15/201611/16/201611/16/2016 1:04:58 PMACANC
Called point of contact, Tyson Phone #: ###-####, left a message on voicemail, did not receive a return call by 1:00pm, inspection request was for an AM inspection, this inspection request will need to be rescheduled.
BLD16-02075 FIRE-Conference11/14/201611/16/201611/16/2016 11:27:54 AMACANC
Recieved a voicemail from Julio Phone #: ###-#### at 10:48am, tried calling back at 10:56am, no answer, left a voicemail stating that I was on my to job site, checked job shack that is site and no one is in job shack, attempted to call again at 11:07am, called again at 11:15am and left a message stating that if no response was made within 10 minutes then this conference will need to be rescheduled. Nothing was recieved by 11:25am so I proceededto my next inspection, this conference is cancelled and a new conference will need to be requested.
BLD16-01680 FIRE-Final Inspection11/15/201611/16/201611/16/2016 10:55:35 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in place with current inspection tags, knox box is in place by office main entry, racking permit is finaled under BLD16-02040. Final life fire safety inspection passed/complete.
BLD16-02040 FIRE-Final Inspection11/16/201611/16/201611/16/2016 10:53:54 AMPPASS
Final racking permit inspection passed/complete
BLD12-01330 FIRE-Final Inspection11/16/201611/16/201611/16/2016 10:39:58 AMAPART
Partial final for life fire safety TCO complete, final fire sprinkler inspection complete for below grade parking, fire alarm system has been tested and accepted for TCO, at this time the JUMP fire panel and the Simplot Headquarters fire panel are not integrated together for parking garage notification, this will need to be completed for FIR and BLD permit finals, fire extinguishers are in place with current inspection tags, knox box is in place by fire command, egress/exit lighting has been tested/inspected. Noted that temporary stairs are still in place by the annex stariwell in the parking garage, TCO will be subject to building inspection acceptance of stairs due to this being an egress point. All area's associated with the BLD and FIR permits will be subject to a final walk through prior to permit final to verify no alterations have been made to items accepted for TCO in regards to life fire safety.
BLD16-04100 FIRE-Final Inspection11/16/201611/16/201611/16/2016 12:00:00 AMPPASS
Work and inspection done under BLD14-03207 shell and core permit.