NAF17-00072
| INSP-Final | 11/14/2017 | 11/16/2017 | 11/16/2017 2:50:40 PM | P | FAIL |
|
|
System failed to operate.
Zach Phone #: ###-#### Inspection requested via web by Don Kartchner
|
FIR17-00541
| INSP-Sprinkler Rough-in/Hydro | 11/16/2017 | 11/16/2017 | 11/16/2017 1:46:42 PM | P | FAIL |
|
|
No approved plans on site. No inspection performed
Rick Phone #: ###-####
|
FIR17-00352
| INSP-Sprinkler Rough-in | 11/16/2017 | 11/16/2017 | 11/16/2017 10:43:47 AM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping is ok to cover
|
BLD17-01593
| FIRE-Final Inspection | 11/15/2017 | 11/16/2017 | 11/16/2017 9:19:07 AM | A | FAIL |
|
|
All items have been corrected except for the second fire extinguisher has not been installed as discussed. Management wants to discuss with fire dept. Re-inspection fee accessed.
Elle Phone #: ###-####
|
FIR17-00432
| INSP-Sprinkler Rough-in/Hydro | 11/16/2017 | 11/16/2017 | 11/16/2017 9:13:35 AM | P | PART |
|
|
24 hour air test started at 9:00am with 43psi on guage.
|
FIR17-00432
| INSP-Sprinkler Rough-in/Hydro | 11/15/2017 | 11/16/2017 | 11/15/2017 2:24:25 PM | A | PASS |
|
|
Overhead rough-in and hydro test passed. I need verification that the air compressor is ok and the outside combustible canopies are meet NFPA 13 8.15.7
tom Phone #: ###-####
|