Inspections for the day of: Wednesday, November 17, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03038 BLD-Energy code compliance11/16/199911/17/199911/17/1999 12:00:00 AMAPASS
JAKE ###-#### RE-INSP -ENERGY CODE
BLD99-02910 BLD-Framing/Rough-in11/16/199911/17/199911/17/1999 12:00:00 AMAPART
###-####-HARRY -SHEAR NAIL Shear wall ok.
BLD99-03000 BLD-Framing/Rough-in11/16/199911/17/199911/17/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/16/1999 at 11:58:17. Contact: .
BLD99-02832 BLD-Framing/Rough-in11/16/199911/17/199911/17/1999 12:00:00 AMAFAIL
ROD --CELL- ###-#### FR INSP C/N truss corr. Nail hangers.
BLD99-02741 BLD-Framing/Rough-in11/16/199911/17/199911/17/1999 12:00:00 AMPPASS
BRIAN --###-#### FR RE-INSP
BLD99-02741 BLD-Energy code compliance11/16/199911/17/199911/17/1999 12:00:00 AMPPASS
BRIAN ###-#### ENERGY CODE
BLD99-02944 BLD-Energy code compliance11/17/199911/17/199911/17/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/17/1999 at 08:25:17. Contact: ###-####.
BLD99-02548 BLD-Final11/17/199911/17/199911/17/1999 12:00:00 AMPPASS
GARY ###-#### FN OCC C/C #16050.
MEC99-02273 Final11/17/199911/17/199911/17/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/17/1999 at 11:08:17. Contact: ###-####. C/N.. Mannual switch furnace, insulate boots, need power to range hood.
BLD99-03048 BLD-Energy code compliance11/16/199911/17/199911/17/1999 12:00:00 AMPPASS
JOHN ###-#### ENERGY CODE INSP
BLD99-01969 BLD-Framing/Rough-in11/16/199911/17/199911/17/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 11/16/1999 at 09:30:44. Contact: ###-####. C/N.. Truss corr.