BLD00-02398
| BLD-Foundation | 11/16/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | A | PART |
|
|
###-#### ###-#### placed with special insp.pending report. 11/16/2000 4:49:25 PM
|
BLD00-02871
| BLD-Framing/Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | A | PASS |
|
|
Phil ###-#### need racking info. for lateral design zone 2b/screws in top leg of ceilling rafter n/w storeroom./duct dector for hvac uints if total is over 2000 cfm. 11/17/2000 10:53:47 AM
|
BLD98-02348
| BLD-Final | 11/16/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PART |
|
|
###-#### Jeff or Ben dead bolt with sigage. 11/17/2000 5:04:47 PM
|
BLD99-02185
| BLD-Framing/Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 16:00:29. Contact: ###-####. main canopy framing screw atchment not per plan leadger on slpit face not per plan rfi for atchment. 11/17/2000 5:01:49 PM
|
BLD00-02405
| BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PASS |
|
|
STEVEN ###-#### WORK--IN GAR
|
BLD00-01146
| BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PART |
|
|
###-#### mech mez erection ok. 11/17/2000 4:01:26 PM
|
BLD00-03190
| BLD-Footing | 11/17/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PASS |
|
|
FT INSP-- ERIK ###-####
|
BLD00-03191
| BLD-Footing | 11/17/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PASS |
|
|
ERIC ###-#### FT
|
BLD00-01563
| BLD-Concrete | 11/16/2000 | 11/17/2000 | 11/17/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:52:52. Contact: ###-####. placed w/s/i 11/17/2000 5:05:57 PM
|