Inspections for the day of: Thursday, November 17, 2005.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00571 INSP-Sprinkler Rough-in11/16/200511/17/200511/18/2005 4:11:46 PMAPART
Sprinkler piping is ok to cover except in the areas where deficiencies have been noted on the city approve plans. Resubmittals of the hydraulic calcs for area #3 are needed since upright heads exceed the 120 maz spacing allowed.
BLD05-01373 FIRE-Final Inspection11/16/200511/17/200511/17/2005 2:50:33 PMPPASS
fire life safety finaled
BLD05-01455 FIRE-Final Inspection11/16/200511/17/200511/17/2005 2:08:15 PMPPASS
Fire life safety finaled
FIR05-00523 INSP-Final Inspection11/16/200511/17/200511/17/2005 2:07:50 PMPPASS
Fire sprinkler finaled
BLD05-02852 FIRE-Final Inspection11/15/200511/17/200511/17/2005 1:56:34 PMAFAIL
hilary; Phone #: ###-#### Provide verification that the overhead sprinkler system is adequate for the racks and commodities installed per the fire dept racking review comments. Provide height limit signs for the maximum storage height.
FIR05-00739 INSP-Sprinkler Rough-in/Hydro11/17/200511/17/200511/17/2005 11:22:31 AMPPART
First floor hydro test and rough-in passed.