ESC11-00781
| Site Preparation | 11/15/2011 | 11/15/2011 | | | |
|
|
|
MEC11-02967
| Final | 11/16/2011 | 11/17/2011 | 11/17/2011 4:58:15 PM | A | FAIL |
|
|
final Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen..called # back at 11:43 am...no return call as of 4:56 pm...i dont know where to go to look at the equipment...there was no contact # for me at the zoo
|
MEC11-03683
| Final | 11/17/2011 | 11/17/2011 | 11/17/2011 4:55:33 PM | P | PASS |
|
|
Around 2pm please. Thanks! Phone #: ###-#### >> Inspection requested via web by April Sims
|
MEC11-03652
| Final | 11/17/2011 | 11/17/2011 | 11/17/2011 3:59:51 PM | P | NH |
|
|
Phone #: ###-#### >> Inspection requested via web by John Bertram...doors locked
|
MEC11-03674
| Final | 11/17/2011 | 11/17/2011 | 11/17/2011 3:10:49 PM | P | PASS |
|
|
Please inspect early afternoon. Thanks! Phone #: ###-#### >> Inspection requested via web by April Sims
|
MEC11-03667
| Final | 11/17/2011 | 11/17/2011 | 11/17/2011 2:49:46 PM | P | PASS |
|
|
Scheduled final for 11/17/2011 PM. Please call Sanga Suvannavong before going out at ###-####. Phone #: ###-#### >> Inspection requested via web by Katie Smith
|
MEC11-03705
| Pressure Test | 11/17/2011 | 11/17/2011 | 11/17/2011 2:26:13 PM | P | PASS |
|
|
Maint. Tim ###-#### Phone #: ###-#### >> Inspection requested via web by Michael Murphy Sweet....20lb gas to existing f/p ok
|
MEC11-03705
| Final | 11/17/2011 | 11/17/2011 | 11/17/2011 2:25:46 PM | P | PASS |
|
|
Maint. Tim ###-#### Phone #: ###-#### >> Inspection requested via web by Michael Murphy Sweet
|
MEC11-03429
| Final | 11/16/2011 | 11/17/2011 | 11/17/2011 2:07:30 PM | P | PASS |
|
|
Homeowner, Sherry, will be home 1 - 5 p.m. Rick Montgomery will be available by phone ###-####, if there are any problems. Phone #: ###-#### >> Inspection requested via web by Rick Montgomery
|
MEC11-03562
| Conference | 11/16/2011 | 11/17/2011 | 11/17/2011 11:35:09 AM | A | FAIL |
|
|
Pressure test and check trench Phone #: ###-#### >> Inspection requested via web by Arlen Dowdy...this should have been a pressure test...backfill under pipe with sand for support...strap gas line at wall where it goes vertical
|
MEC11-03542
| Final | 11/16/2011 | 11/17/2011 | 11/17/2011 10:12:45 AM | A | PASS |
|
|
final Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
MEC11-03701
| Final | 11/16/2011 | 11/17/2011 | 11/17/2011 10:11:48 AM | A | PASS |
|
|
Call Linda before going Phone #: ###-#### >> Inspection requested via web by Michele LaMott
|
GCM11-00201
| GCM-Final | 11/16/2011 | 11/17/2011 | 11/17/2011 9:21:31 AM | A | NR |
|
|
Ryan @ ###-####... equipment not installed at this time
|
MEC11-03612
| Final | 11/11/2011 | 11/17/2011 | 11/17/2011 9:19:26 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Tom Soniville
|
MEC11-03671
| Final | 11/16/2011 | 11/17/2011 | 11/17/2011 8:52:38 AM | A | PASS |
|
|
furn ok
|