ELE12-03157
| ELE-Aging Inspection | 11/17/2015 | 11/17/2015 | 11/24/2015 11:04:23 AM | | CANC |
|
|
too busy
|
ELE12-02468
| ELE-Aging Inspection | 11/17/2015 | 11/17/2015 | 11/24/2015 11:04:03 AM | | CANC |
|
|
too busy
|
GCE15-00163
| GCE-Rough-In | 11/17/2015 | 11/17/2015 | 11/17/2015 3:20:12 PM | P | DONE |
|
|
Jesse ###-#### - call ahead 30min. - CONFERENCE ONLY -discussed working clearences for electrical room and bonding for existing gear contractor had a uffer poured
|
ELE15-03729
| Conference | 11/17/2015 | 11/17/2015 | 11/17/2015 2:36:33 PM | P | DONE |
|
|
Please call Brad Hoots at ###-#### 30 minutes prior so he can meet you there. Phone #: ###-#### Inspection requested via web by Kerri Hamilton discussed kitchen remodel only. recepacle layouts and notching cinder block
|
ELE15-01730
| Final | 11/17/2015 | 11/17/2015 | 11/17/2015 1:45:03 PM | P | PASS |
|
|
would like call ahead; Larry Phone #: ###-#### addition final ok
|
ELE15-03616
| Final | 11/16/2015 | 11/17/2015 | 11/17/2015 1:19:50 PM | P | PASS |
|
|
This install was done on a Saturday, so the rough-in inspection for the panel and inverter listing check was not called in. If this is needed for this project you can give me a call a couple hours ahead of your inspection, and I can meet you there to pull a couple panels up.
Otherwise the install was done according to approved plans, with no deviations or product changes. There is a single home run from the array to the knife switch located next to the meter base. And from the knife switch to the exterior sub panel also next to the meter base. The panels, inverters and rails are all bonded with a number six ground that runs unbroken from the array to the visible electrode under the meter base. The service panel, sub panel and knife switch are all exterior, so no inside access will be needed. Thanks guy''s, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King final ok
|
ELE15-03616
| Electrical Rough-In | 11/17/2015 | 11/17/2015 | 11/17/2015 1:19:36 PM | P | PASS |
|
|
This install was done on a Saturday, so the rough-in inspection for the panel and inverter listing check was not called in. If this is needed for this project you can give me a call a couple hours ahead of your inspection, and I can meet you there to pull a couple panels up.
Otherwise the install was done according to approved plans, with no deviations or product changes. There is a single home run from the array to the knife switch located next to the meter base. And from the knife switch to the exterior sub panel also next to the meter base. The panels, inverters and rails are all bonded with a number six ground that runs unbroken from the array to the visible electrode under the meter base. The service panel, sub panel and knife switch are all exterior, so no inside access will be needed. Thanks guy''s, Ryan King Phone #: ###-#### Inspection requested via web by Ryan King rough-in ok
|
ELE15-03219
| Electrical Rough-In | 11/17/2015 | 11/17/2015 | 11/17/2015 12:51:56 PM | P | PASS |
|
|
Contact: Beau Cannon Phone #: ###-#### Inspection requested via web by Deb Gooden hard lids ok cover
|
ELE15-03431
| Final | 11/17/2015 | 11/17/2015 | 11/17/2015 12:29:18 PM | P | PASS |
|
|
jose Phone #: ###-#### final ok
|
ELE15-03568
| Electrical Rough-In | 11/16/2015 | 11/17/2015 | 11/17/2015 11:15:36 AM | A | PASS |
|
|
If its locked in the center of the apartment complex by the bike rack is a lock box. The lock box code is 0328. Phone #: ###-#### Inspection requested via web by Eric Schroeder adding outlets and lights ok cover
|
ELE15-03700
| Electrical Rough-In | 11/16/2015 | 11/17/2015 | 11/17/2015 10:28:26 AM | A | PASS |
|
|
underground conduits Phone #: ###-#### Inspection requested via web by Karl Paige underground conduits under pavers ok cover
|
ELE15-02460
| Electrical Rough-In | 11/16/2015 | 11/17/2015 | 11/17/2015 10:11:20 AM | A | PASS |
|
|
Ceiling Inspection, ###-####. Greg Milburn. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce remaining cieling ok cover
|
ELE15-03718
| Temporary Service | 11/16/2015 | 11/17/2015 | 11/17/2015 9:49:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon t/s u/g n ok
|
ELE15-02703
| Final | 11/16/2015 | 11/17/2015 | 11/17/2015 9:34:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn final ok
|
ELE15-02702
| Final | 11/16/2015 | 11/17/2015 | 11/17/2015 9:34:16 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn w/p in-op 314.27 (b) floor receptacles shal be listed for that application
|