Inspections for the day of: Tuesday, November 17, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01279 General Inspection11/16/201511/17/201511/18/2015 12:20:21 PMAPASS
Lucky Harris 13, now Harris Crossing has active SFH construction in progress by Hunter Homes. SFHs within subdivision are permitted seperately.

Site is in good condition with no erosion or areas of sediment runoff. Perimeter is contained by combination of landscaping, preservation of existing vegetation, and installed of silt fence. A new section of silt fence has been installed to protect the Greenbelt path way from work on the east side of Caddis.

Lined concrete washout provided, trash containers are onsite, and storm drains have protection.

No violations, no correction requests at this time.
ESC15-00586 General Inspection11/17/201511/17/201511/17/2015 3:38:13 PM CANC
needs site prep; rescheduled for 11/17 AM
ESC15-01285 General Inspection11/17/201511/17/201511/17/2015 2:08:24 PMPPASS
Pioneer Path corridor is in progress. No trackout or sediment leaving construcion area. Area DIs have sediment protection due to work on the Payette Brewery project adjacent to pathway. No violations or issues observed.
ESC15-00942 General Inspection11/17/201511/17/201511/17/2015 2:02:58 PMPPASS
WIP on foundation and platform for River Street Storage. Permit sign posted, access controlled via construction entrance. No trackout or discharges observed; DI bags installed. Approved.
ESC13-01159 General Inspection11/17/201511/17/201511/17/2015 12:53:37 PM PASS
BMPs installed and two parcels have active construction by CBH. Workers staying off muddy areas and parking on street. No sediment runoff, trackout, or other violations observed. Approved.
ESC15-00271 Site Final11/17/201511/17/201511/17/2015 11:40:04 AMPPASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00268 Site Final11/17/201511/17/201511/17/2015 11:16:24 AMPPASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00221 General Inspection11/17/201511/17/201511/17/2015 11:15:11 AM PASS
WIP. Frame is up and driveway is complete. Yard is not stabilized but is below grade of curbing and driveway. No trackout or sediment runoff, trash and materials are contained. No hillside disturbance in old house demo and new SFH construction.
ESC15-00283 Aging Inspection11/17/201511/17/201511/17/2015 11:13:10 AM PASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00283 DOC - Permit Finaled11/17/201511/17/201511/17/2015 11:12:57 AMPPASS
ESC15-00284 Aging Inspection11/17/201511/17/201511/17/2015 11:12:15 AM PASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00284 DOC - Permit Finaled11/17/201511/17/201511/17/2015 11:12:04 AMPPASS
ESC15-00279 Aging Inspection11/17/201511/17/201511/17/2015 11:11:50 AM PASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00279 DOC - Permit Finaled11/17/201511/17/201511/17/2015 11:11:33 AMPPASS
ESC15-00280 Aging Inspection11/17/201511/17/201511/17/2015 11:11:00 AM PASS
Exterior work on all 14 townhomes in development is complete, some units occupied. Common areas are landscaped and stabilized.

All ESC permits finaled except for 2703 Malad (ESC15-00267) and main sub permit ESC14-00892 with request to Gary Olson to sweep up after dumpster removal and to remove DI bag installed at the south stormdrain of the block.
ESC15-00280 DOC - Permit Finaled11/17/201511/17/201511/17/2015 11:05:37 AMPPASS
ESC15-00070 General Inspection11/17/201511/17/201511/17/2015 10:05:15 AM PASS
ESC15-00285 Aging Inspection11/17/201511/17/201511/17/2015 9:32:33 AM PASS
Construction complete on shopping center TI. No materials or disturbed area remaining on site. ESC permit conditions satisfied; BLD final still open...
ESC15-00285 DOC - Permit Finaled11/17/201511/17/201511/17/2015 9:31:44 AMPPASS
ESC15-00006 General Inspection11/17/201511/17/201511/17/2015 9:05:22 AM PASS