FIR17-00393
| INSP-Sprinkler Rough-in | 11/17/2017 | 11/17/2017 | 11/17/2017 12:40:37 PM | P | PART |
|
|
Inspection for overhead fire sprinkler piping located above hardlids in area of work complete, hardlids approved for cover.
|
FIR17-00255
| INSP-Sprinkler Rough-in | 11/17/2017 | 11/17/2017 | 11/17/2017 12:39:25 PM | P | PART |
|
|
Rough in inspection for overhead fire sprinkler piping complete. A rough to cover inspection will need to scheduled for finished heads before cover can be approved.
|
FIR17-00407
| INSP-Sprinkler Rough-in | 11/16/2017 | 11/17/2017 | 11/17/2017 11:19:52 AM | A | PART |
|
|
Rough in inspection for overhead fire sprinkler piping in the west side 2 level addition complete. A rough to cover inspection will need to scheduled for finished heads before cover can be approved.
|
FIR17-00460
| INSP-Sprinkler Rough-in | 11/16/2017 | 11/17/2017 | 11/17/2017 10:13:37 AM | A | PASS |
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
BLD16-01892
| FIRE-Final Inspection | 11/16/2017 | 11/17/2017 | 11/17/2017 9:44:08 AM | A | PASS |
|
|
No fire sprinkler modifications (fire sprinkler inspection is currrent), no fire alarm modifications (refer to attached letter in documents: BO & FM OCC LOAD REQUEST for occupancy reduction for voice evacuation on the fire alarm system) fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIR17-00267
| INSP-Sprinkler Rough-in | 11/14/2017 | 11/17/2017 | 11/17/2017 8:28:53 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 hardlids approved for cover.
|
FIR17-00102
| INSP-Supply line flush | 11/13/2017 | 11/17/2017 | 11/17/2017 8:28:04 AM | A | DONE |
|
|
Underground supply flush complete.
|