Inspections for the day of: Monday, November 18, 1996.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-03526 INSP - Retro Fit (check note)11/18/199611/18/199611/19/1996 12:00:00 AMPPASS
11/18/96 350 - PT OK #32842 FINAL
MEC96-03511 INSP - Gas pressure test11/18/199611/18/199611/18/1996 12:00:00 AM PASS
/ / 350 - F/P OK PT OK #32863 FINAL
BLD95-01732 INSP - Letter of compliance11/18/199611/18/199611/18/1996 12:00:00 AM PASS
/ / 350 - C/C #11921
BLD95-01732 INSP - Letter of compliance11/18/199611/18/199611/18/1996 12:00:00 AM PASS
/ / 350 - C/C #11921
MEC96-02867 INSP - Retro Fit (check note)11/18/199611/18/199611/18/1996 12:00:00 AM FAIL
/ / 350 - NO FINAL, HAVE FURN. IN BEDROOM, HAVE TO BRING COMB. AIR IN ADD LIGHT TO FURN. ROOM.
MEC96-03189 INSP - Framing/ Rough-in11/18/199611/18/199611/18/1996 12:00:00 AM PASS
/ / 350 - R/I OK, MEET HOME OWNER
MEC96-03463 INSP - Framing/ Rough-in11/15/199611/18/199611/18/1996 12:00:00 AMAPART
11/18/96 350 - REINSPECTION HEATING CORRECTIONS OK, STILL NEED FP PERMIT, LEFT NOTICE
MEC96-03469 INSP - Final11/15/199611/18/199611/18/1996 12:00:00 AMANH
11/18/96 350 - NO ONE HOME LEFT NOTICE
MEC96-03469 INSP - Final11/15/199611/18/199611/18/1996 12:00:00 AMANH
11/18/96 350 - NO ONE HOME LEFT NOTICE
MEC96-03490 INSP - Gas pressure test11/15/199611/18/199611/18/1996 12:00:00 AMAPASS
11/18/96 350 - owner will be home PT OK #32849 FINAL
BLD95-01732 INSP - Final11/15/199611/18/199611/18/1996 12:00:00 AMAPASS
11/18/96 350 - FINAL
MEC96-03515 INSP - Rough-in & Gas Pressure11/15/199611/18/199611/18/1996 12:00:00 AMAPASS
11/18/96 350 - R/I OK PT OK #32845
BLD96-02828 INSP - Framing/Rough-in11/15/199611/18/199611/18/1996 12:00:00 AMAPASS
11/18/96 350 - insulation OK, OK TO COVER
MEC96-03189 INSP - Retro Fit (check note)11/15/199611/18/199611/18/1996 12:00:00 AMANH
11/18/96 350 - ###-####/rochelle/ furnace/ to have her meet with you at TRIED TO CALL, GOT NO ANSWER OR ANSWERING MACHINE, PRESSURE TEST ON GASL PASSED IF THIS IS WHAT SHE WANTED.
BLD96-03027 INSP - Footings11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
11/18/96 350 - SETBACKS OK, FTNS OK
MEC96-03527 INSP - Rough-in & Gas Pressure11/18/199611/18/199611/18/1996 12:00:00 AMPPART
11/18/96 350 - rough-in pressure test/3 gas furnace/4 electric furnace/7 vents/3 gas test PT OK #32858,868,840, NO R/I CORRECTIONS
MEC96-03534 INSP - Retro Fit (check note)11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
/ / 350 - pressure test/ venting OK PT OK #32851, NO FURN. TIL NEXT SP
BLD96-00912 INSP - Footings11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
11/18/96 350 - FTNS AND REBAR AS PER PLANS
BLD96-02293 INSP - Framing/Rough-in11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
11/18/96 350 - FRAME OK, OK TO INSULATE
MEC96-03445 INSP - Retro Fit (check note)11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
11/18/96 350 - FURN OK FINAL ì
MEC96-03148 INSP - Retro Fit (check note)11/18/199611/18/199611/18/1996 12:00:00 AMPPASS
11/18/96 350 - FURN/PT OK, PT BY GAS CO.,WILL NEED INSPECTION ON W/H LAT