MEC97-02696
| INSP - Final | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
MEC97-02696
| INSP - Final | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
MEC97-03336
| INSP - Final | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | NR |
|
|
/ / 342 -
|
MEC97-03336
| INSP - Final | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | NR |
|
|
/ / 342 -
|
MEC97-03405
| INSP - Gas pressure test | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | PASS |
|
|
/ / 342 -
|
MEC97-03411
| INSP - Framing/ Rough-in | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | NR |
|
|
/ / 342 - no lines, no gauge, no one there
|
BLD97-03461
| INSP - Roof | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | | PASS |
|
|
/ / 342 - roof tear off
|
BLD97-02307
| INSP - Framing/Rough-in | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 - bracing two trusses....ok to insulate
|
MEC97-03334
| INSP - Framing/ Rough-in | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | FAIL |
|
|
11/18/97 342 - still not ready...p/t failed, gas pipe not supported corr
|
BLD97-02999
| INSP - Footings | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | NR |
|
|
11/18/97 342 - READY AT 12:00
|
BLD97-01561
| INSP - Wall cover | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | FAIL |
|
|
11/18/97 342 - FIRE WALL IN ROOM 250 fire wall not to plan, not to specs looked at first layer of two hour assembly's...detail and resubmittal re
|
BLD97-02619
| INSP - Final | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 - MEET DAN BETWEEN 8:30 AND 9:00
|
BLD97-02680
| INSP - Footings | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 -
|
BLD97-02680
| INSP - Foundation | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PART |
|
|
11/18/97 342 - need thermal break for slab const in conditioned space
|
MEC97-03405
| INSP - Retro Fit (check note) | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | FAIL |
|
|
11/18/97 342 - W\H FURN\GAS LINE
|
MEC97-02200
| INSP - Final | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 -
|
MEC97-02200
| INSP - Final | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | A | PASS |
|
|
11/18/97 342 -
|
MEC97-03285
| INSP - Framing/ Rough-in | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | PASS |
|
|
11/18/97 342 -
|
MEC97-03336
| INSP - Gas log/ Fireplace | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | NR |
|
|
11/18/97 342 - GAS LOG AND PIPING
|
BLD97-02723
| INSP - Footings | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | PART |
|
|
11/18/97 342 - special inspector on site
|
BLD97-01567
| INSP - Conference | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | FAIL |
|
|
11/18/97 342 - he called back and around 3:00 met w/arch, plan ck & contractor, 1 hr wall fix detail updated, arch submitting details for const in lieu of a parapet 5' protection, area sep overhang, wall detail fix, wall detail for self supporting 2 hr area separation and details for all changes from approved plan
|
BLD97-02128
| INSP - Final | 11/17/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | FAIL |
|
|
11/18/97 342 - need code complying handrail, placement of equipment and
|
MEC97-03411
| INSP - Retro Fit (check note) | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | NH |
|
|
11/18/97 342 - furnace / gas test
|
BLD95-01578
| INSP - Framing/Rough-in | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | PASS |
|
|
11/18/97 342 -
|
BLD97-02605
| INSP - Footings | 11/18/1997 | 11/18/1997 | 11/18/1997 12:00:00 AM | P | PART |
|
|
11/18/97 342 - garage and No wall ok
|