BLD97-01482
| INSP - Final | 11/18/1998 | 11/18/1998 | 11/18/1998 12:00:00 AM | P | FAIL |
|
|
BILL ###-#### FN OCC INSP-CALL 1ST BEFORE INSP...need htg final, s.c. door at gar. seal penetrations, etc.
|
BLD98-02400
| INSP - Framing/Rough-in | 11/18/1998 | 11/18/1998 | 11/18/1998 12:00:00 AM | P | FAIL |
|
|
met w/ bldr....told ok to insulate, gas test must be recalled however
|
BLD98-03453
| INSP - Foundation | 11/18/1998 | 11/18/1998 | 11/18/1998 12:00:00 AM | P | PART |
|
|
ftg appears ok, poured
|
BLD98-03473
| INSP - Framing/Rough-in | 11/18/1998 | 11/18/1998 | 11/18/1998 12:00:00 AM | P | NR |
|
|
BILL ###-#### FR INSP...nr need all other insp's; met w/owner, discussed 1hr wall req's at prop line. mis-called as frame
|
BLD98-03473
| INSP - Foundation | 11/18/1998 | 11/18/1998 | 11/18/1998 12:00:00 AM | P | PART |
|
|
poured, appears ok.
|