BLD99-02153
| FIRE-Final Inspection | 11/17/1999 | 11/18/1999 | 11/18/1999 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 14:32:27. Contact: ###-####. Occ. Approved 09/08/99.
|
BLD99-02844
| FIRE-Conference | 11/17/1999 | 11/18/1999 | 11/18/1999 12:00:00 AM | A | PART |
|
|
Bob Cafferty, ###-#### Requested exiting plan to occupy pods 07/08/99.
|
FIR99-00391
| INSP-Sprinkler Rough-in/Hydro | 11/18/1999 | 11/18/1999 | 11/18/1999 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 09:00:39. Contact: ###-####. Ok to cover 2nd floor- room west of elevator shaft.
|
BLD98-01168
| FIRE-Sprinkler Rough-in | 11/18/1999 | 11/18/1999 | 11/18/1999 12:00:00 AM | P | PART |
|
|
Tested fire pump and fire pump controller; flow test passed; controller not monitored.
|