Inspections for the day of: Monday, November 18, 2002.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-03511 Plumbing Rough-in11/15/200211/18/200211/18/2002 12:00:00 AMAFAIL
HENRY ###-#### water heater will require a sump to handle t&p and pan drain, 30 gpm min. vented sump, pipe 3/4 feed to water heater from main shutoff valve, vent shower trap, test w&v and water systems 11/18/2002 9:13:51 AM
PLM02-02980 Final11/17/200211/18/200211/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/17/2002 at 13:48:21. Contact: ###-####. final ok 11/18/2002 9:45:03 AM
PLM02-03524 Plumbing Rough-in11/18/200211/18/200211/18/2002 12:00:00 AMPPASS
craig ###-#### ri ok 11/18/2002 2:24:44 PM
PLM02-03505 Sprinkler (Final)11/15/200211/18/200211/18/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/15/2002 at 10:30:28. Contact: ###-####. sprnkler final ok 11/18/2002 1:54:46 PM