Inspections for the day of: Tuesday, November 18, 2003.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-02634 Rough-in11/17/200311/18/200311/18/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/17/2003 at 1:38:08 PM. Contact: ###-####. Rough in ok but pressure test under 10 lbs on guage. Correct and re-call. 11/18/2003 8:54:41 AM
MEC03-02552 Final11/17/200311/18/200311/18/2003 12:00:00 AMAPASS
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
MEC03-02553 Final11/17/200311/18/200311/18/2003 12:00:00 AMAPASS
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
MEC03-03063 Rough-in11/17/200311/18/200311/18/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/17/2003 at 3:55:21 PM. Contact: ###-####.
MEC03-02634 Rough-in11/18/200311/18/200311/18/2003 12:00:00 AMAPASS
BLD03-02169 BLD-Final11/18/200311/18/200311/18/2003 12:00:00 AMPNR
###-#### john Discussed with permitee, needs additions sign off per R. Jackson. 11/18/2003 2:43:38 PM
BLD03-02507 BLD-Framing/Rough-in11/18/200311/18/200311/18/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/18/2003 at 11:15:11 AM. Contact: ###-####. C/N issued--Ok to insulate. 11/18/2003 3:36:21 PM
BLD03-01272 BLD-Framing/Rough-in11/18/200311/18/200311/18/2003 12:00:00 AMPDONE
Phone #: ###-#### Internet Inspection Request from: Adam Johnson C of C was issued by inspector 316 in september 03??? I will fast final. 11/18/2003 3:13:13 PM
BLD03-02434 BLD-Framing/Rough-in11/18/200311/18/200311/18/2003 12:00:00 AMPNR
Phone #: ###-#### Internet Inspection Request from: Adam Johnson No shear required--frame not ready, need trades first. 11/18/2003 1:27:34 PM
BLD03-01415 BLD-Footing11/18/200311/18/200311/18/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/18/2003 at 7:46:37 AM. Contact: ###-####. wip 11/18/2003 3:35:49 PM
BLD03-00410 BLD-Foundation11/18/200311/18/200311/18/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 11/18/2003 at 8:26:22 AM. Contact: ###-####. wip--pumping concrete when inspector arrived--part already covered. 11/18/2003 2:04:27 PM
BLD03-02712 BLD-Foundation11/18/200311/18/200311/18/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 11/18/2003 at 8:28:28 AM. Contact: ###-####.