ESC04-00555
| BMP Violation | 11/17/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | A | PASS |
|
|
|
ESC04-00707
| Site Preparation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | PART |
|
|
Informed rp that overall site is in compliance, my only comment was it would be a good idea to protect the strom drain inlet at the downhill curb cutout, this drains into the ditch down gradient of the parking lot. 11/18/2004 3:29:47 PM
|
ESC04-01287
| BMP Violation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | FAIL |
|
|
C/N to rp. 11/18/2004 2:09:42 PM
|
ESC04-01356
| BMP Violation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | FAIL |
|
|
Correction to rp trackout, trash management, no signage no cons. entrance. 11/18/2004 2:08:08 PM
|
ESC04-01286
| BMP Violation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | FAIL |
|
|
C/Notice to rp. 11/18/2004 2:08:53 PM
|
ESC04-01285
| BMP Violation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | FAIL |
|
|
C/N to rp. 11/18/2004 2:09:59 PM
|
ESC04-01247
| BMP Violation | 11/18/2004 | 11/18/2004 | 11/18/2004 12:00:00 AM | P | PART |
|
|
Verbal correction to rp--signage, sweeping of hard surfaces, sediment barrier will be needed along overland if veg. is removed along overland road. 11/18/2004 2:48:17 PM
|