BLD05-00426
| BLD-Framing/Rough-in | 11/18/2005 | 11/18/2005 | 11/18/2005 4:40:18 PM | P | DEFR |
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles out of time rolled to monday am.
|
BLD05-02599
| BLD-Footing | 11/17/2005 | 11/18/2005 | 11/18/2005 4:32:27 PM | P | FAIL |
|
|
nathan Note: 1:00 pm; Phone #: 1-###-#### Internet Inspection Request from: Cathy Chiles placed w/o insp/ no plans on site.
|
BLD05-01899
| BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 4:23:01 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 6:42:56 PM. Contact: ###-####.90 min door needs instaled/ exitpath to be maintaned/ firestopping ok above ceilling.
|
BLD05-02474
| BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 4:20:58 PM | P | FAIL |
|
|
Internet Inspection Request from: Alex Monge ada protection/clean exit path.
|
BLD05-02475
| BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 4:20:10 PM | P | FAIL |
|
|
Internet Inspection Request from: Alex Monge ada protection/ clean exit path.
|
BLD05-02222
| BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 4:19:08 PM | P | FAIL |
|
|
Internet Inspection Request from: Alex Monge fire stopping/ door trip test/ signage door hardware maine entry.
|
MIS05-00211
| BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 4:17:34 PM | A | FAIL |
|
|
sandra -- cell--###-#### or office ###-#### need door signage for hardware.
|
BLD05-00458
| BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 1:54:05 PM | P | NR |
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
MIS05-00207
| BLD-Final | 11/16/2005 | 11/18/2005 | 11/18/2005 1:36:32 PM | P | CANC |
|
|
###-#### - carolyn
|
BLD05-00521
| BLD-Conference | 11/17/2005 | 11/18/2005 | 11/18/2005 11:41:58 AM | A | PASS |
|
|
everett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-01916
| BLD-Framing/Rough-in | 11/17/2005 | 11/18/2005 | 11/18/2005 10:54:27 AM | A | PART |
|
|
ceiling grid inspection//rock; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceilling ok no ele atched activity of ele they gave me was ok for ceilling cover.
|
BLD05-00624
| BLD-Framing/Rough-in | 11/17/2005 | 11/18/2005 | 11/18/2005 10:53:08 AM | A | PART |
|
|
ceiling grid inspection//rock; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceilling ok no ele permit atched to group and no insp. activity on permit # they gave me.
|
BLD05-01856
| BLD-Aging Inspection | 11/18/2005 | 11/18/2005 | 11/18/2005 7:34:36 AM | | PART |
|
|
wip
|
BLD05-02476
| BLD-Final | 11/16/2005 | 11/18/2005 | 11/18/2005 7:23:57 AM | A | FAIL |
|
|
Internet Inspection Request from: Alex Monge fire alarm plans ready for pick up and sprinkler plan still under review, needs all other trade final insp. no insp performed no contact number prvided to call .
|
BLD05-03084
| BLD-Foundation | 11/17/2005 | 11/18/2005 | 11/18/2005 12:00:00 AM | P | CANC |
|
|
hild renovation; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa jack canc
|