BLD05-01704
| BLD-Framing/Rough-in | 11/17/2005 | 11/18/2005 | 11/18/2005 5:00:47 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 2:14:15 PM. Contact: ###-####.
|
BLD05-02624
| BLD-Energy code compliance | 11/18/2005 | 11/18/2005 | 11/18/2005 3:28:32 PM | P | PASS |
|
|
###-#### - michale
|
BLD05-02624
| BLD-Framing/Rough-in | 11/18/2005 | 11/18/2005 | 11/18/2005 3:28:15 PM | P | PASS |
|
|
|
BLD05-01119
| BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 2:59:48 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 12:01:30 PM. Contact: ###-####. Elec. final failed.
|
BLD05-01935
| BLD-Final | 11/16/2005 | 11/18/2005 | 11/18/2005 2:46:14 PM | P | PEND |
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 3:19:15 PM. Contact: ###-####. Temp. occ granted. Needs to tie mag locks into alarm system. fire/life has given temp. occ.
|
BLD05-02621
| BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 2:06:11 PM | P | CANC |
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD05-02247
| BLD-Footing | 11/17/2005 | 11/18/2005 | 11/18/2005 1:48:09 PM | P | NR |
|
|
###-#### - santos. Footings still being excavated.
|
BLD05-02919
| BLD-Foundation | 11/17/2005 | 11/18/2005 | 11/18/2005 11:05:14 AM | A | PART |
|
|
larry hobbs ###-####
|
BLD05-01131
| BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 9:54:17 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Weston Kons
|
BLD05-01335
| BLD-Energy code compliance | 11/17/2005 | 11/18/2005 | 11/18/2005 9:20:45 AM | A | FAIL |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Items on previous c/n not repaired. Not ok to cover.
|
BLD05-02640
| BLD-Footing | 11/17/2005 | 11/18/2005 | 11/18/2005 9:09:01 AM | A | PASS |
|
|
dane; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-01131
| DOC - Permit Finaled | 11/18/2005 | 11/18/2005 | 11/18/2005 12:00:00 AM | P | PASS |
|
|
|
BLD05-01503
| BLD-Framing/Rough-in | 11/18/2005 | 11/18/2005 | 11/18/2005 12:00:00 AM | P | FAIL |
|
|
Needs to complete lateral bracing. Minimum 3 8d nails for attic truss connection. Need solid blocking underneath floor at bearing points. engineer to review install of drag strut at stairway.
|