Inspections for the day of: Tuesday, November 18, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00073 BMP Violation11/14/200811/18/200811/18/2008 4:20:55 PMAPASS
ESC08-00748 General Inspection11/18/200811/18/200811/18/2008 3:43:26 PMPFAIL
Clean all hard surfaces of all sediment and debris. Will re-inspect on 11/20/08.
ESC08-00760 General Inspection11/18/200811/18/200811/18/2008 2:44:28 PMPFAIL
Need to clean up all trash debris and get rid of of or place into the trash container. Also maintain all BMP's along the front of the lot. Wil re-inspect on 11/20/08 AM
ESC08-00725 General Inspection11/14/200811/18/200811/18/2008 2:27:39 PMAPASS
ESC08-00737 Site Preparation11/18/200811/18/200811/18/2008 2:20:56 PMPFAIL
Told to retaining wall company that a construction entrance is required for there work. They hae until 11/19/08 to have one installed. Will re-inspect on 11/19/08 Pm
ESC08-00539 Tracking Control11/17/200811/18/200811/18/2008 1:21:58 PMAPART
still need to re-install wattles.
ESC08-00948 Site Preparation11/14/200811/18/200811/18/2008 1:13:18 PMAPASS
ESC08-00866 Conference11/18/200811/18/200811/18/2008 1:00:33 PMADONE
ESC04-01522 Site Final11/18/200811/18/200811/18/2008 9:18:04 AMPPASS
ESC08-00490 General Inspection11/18/200811/18/200811/18/2008 8:56:47 AMAFAIL
Maintain all D.I.'s on project area. Clean all gutterpan within the interior of the project. Sweep up all perimeter of all sediment and debris. Will re-inspect on 11/19/08
ESC07-01595 Random Inspection11/18/200811/18/200811/18/2008 8:46:29 AMAPASS

ESC08-00725 Site Preparation11/18/200811/18/200811/18/2008 8:34:21 AMAPASS