Inspections for the day of: Wednesday, November 18, 2009.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDoug A Poedy
TitleELE-INSPECTOR
Phone #447-7209
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-01922 Final11/18/200911/18/200911/18/2009 3:55:23 PMPPASS
Final electrical inspection at clubhouse. Contact is Brian Cornell. Phone #: ###-#### Internet Inspection Request from: Richard Montgomery
ELE09-01922 DOC - Permit Finaled11/18/200911/18/200911/18/2009 3:55:05 PMPPASS
ELE09-02212 Electrical Rough-In11/12/200911/18/200911/18/2009 3:54:12 PMPPASS
james Phone #: ###-####
ELE09-02212 Final11/18/200911/18/200911/18/2009 3:54:01 PMPPASS
james Phone #: ###-####
ELE09-02212 Electrical Rough-In11/18/200911/18/200911/18/2009 3:52:57 PMPPASS
james Phone #: ###-####
ELE09-02251 Electrical Rough-In11/18/200911/18/200911/18/2009 3:52:21 PMPPASS
Darin - On 3rd Floor Franklin Plaza Building Phone #: ###-#### Internet Inspection Request from: Kevin Perez. Ok to cover walls.
ELE09-01839 Final11/18/200911/18/200911/18/2009 2:01:21 PMPPASS
service riser repaired Phone #: ###-#### Internet Inspection Request from: Joe Thomas
ELE09-01839 DOC - Permit Finaled11/18/200911/18/200911/18/2009 2:01:10 PMPPASS
ELE09-02212 Final11/18/200911/18/200911/18/2009 2:00:51 PMPPASS
james Phone #: ###-####
ELE08-01801 Final11/17/200911/18/200911/18/2009 2:00:24 PMPPASS
Strapped liquid tight flex to motors, replaced faceplates for switches. None of the outlets in this structure where done by us, assuming you are talking about the panel cover which we replaced. Just pool equipment. Stucco guys had removed everything and didn''t notify me. Thanks Phone #: ###-#### Internet Inspection Request from: Lynn Cable
ELE09-02223 Permanent Service11/18/200911/18/200911/18/2009 2:00:05 PMPCANC
NEAL Phone #: ###-####
ELE09-02224 Permanent Service11/18/200911/18/200911/18/2009 1:59:41 PMPCANC
NEAL Phone #: ###-####
ELE09-02223 Final11/18/200911/18/200911/18/2009 1:59:15 PMPPASS
NEAL Phone #: ###-####
ELE09-02224 Final11/18/200911/18/200911/18/2009 1:59:00 PMPPASS
NEAL Phone #: ###-####
ELE09-02244 Final11/17/200911/18/200911/18/2009 10:07:29 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Lloyd Looney. Left survey NEC 330.30 Securing mc cable.
GCE09-00037 GCE-Rough-In11/17/200911/18/200911/18/2009 9:32:03 AMAPASS
Additional inspection for floor heat bathroom.Contact Mike @###-####. Ok to cover floor heat.
ELE09-02210 Rough-In Permanent Service11/17/200911/18/200911/18/2009 9:23:07 AMAPASS
BOB Phone #: ###-####. Ok to cover 2 inch secondary conduit.
ELE09-01937 Final11/17/200911/18/200911/18/2009 8:55:12 AMAPASS
Call 30 minutes prior to arrange access. Phone #: ###-#### Internet Inspection Request from: Steve Craig
ELE09-01937 DOC - Permit Finaled11/18/200911/18/200911/18/2009 8:54:56 AMPPASS