BLD11-02165
| FIRE-Conference | 11/15/2011 | 11/15/2011 | | P | |
|
|
|
BLD11-01590
| FIRE-Final Inspection | 11/17/2011 | 11/18/2011 | 11/18/2011 3:30:49 PM | A | PASS |
|
|
life safety passed
|
BLD11-01527
| FIRE-Final Inspection | 11/17/2011 | 11/18/2011 | 11/18/2011 3:29:58 PM | A | PASS |
|
|
life safety passed
|
FIR11-00560
| INSP-Final Inspection | 11/17/2011 | 11/18/2011 | 11/18/2011 12:11:46 PM | A | FAIL |
|
|
Provide the correct building address, re-install the smoke detector over the facp and provide the AC power monitoring as per the installation guide for the DSC
|
FIR11-00590
| INSP-Final Inspection | 11/17/2011 | 11/18/2011 | 11/18/2011 12:02:36 PM | A | CANC |
|
|
My early was not early enough. Inspection will be rescheduled per Brian.
|
BLD11-02588
| FIRE-Final Inspection | 11/17/2011 | 11/18/2011 | 11/18/2011 12:00:00 AM | A | CANC |
|
|
Jesse Phone #: ###-####
|