MEC11-02424
| Final | 11/18/2011 | 11/18/2011 | 11/18/2011 4:17:40 PM | P | PASS |
|
|
Ok per balance report on plans. Using engineers numbers from previous design using existing air handler for make up air.
|
MEC11-03713
| Pressure Test | 11/17/2011 | 11/18/2011 | 11/18/2011 4:13:48 PM | P | PASS |
|
|
meet at 3:30pm 60# test to existing gas line to kitchen line
|
MEC11-03562
| Pressure Test | 11/18/2011 | 11/18/2011 | 11/18/2011 2:05:21 PM | P | PASS |
|
|
30# test
|
MEC11-03562
| Final | 11/18/2011 | 11/18/2011 | 11/18/2011 2:04:56 PM | P | PASS |
|
|
|
MEC11-03720
| Final | 11/18/2011 | 11/18/2011 | 11/18/2011 7:41:23 AM | P | CANC |
|
|
INSTALLER JEREMY ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|
MEC11-02424
| Pressure Test | 11/16/2011 | 11/18/2011 | 11/17/2011 2:59:49 PM | P | CANC |
|
|
meet at 3:30pm contractor pulled another permit for gas piping work
|