ELE15-03007
| Final | 11/18/2015 | 11/18/2015 | 11/18/2015 2:30:09 PM | P | PASS |
|
|
Dan Hommel Phone #: ###-#### Inspection requested via web by Kerri Hamilton final ok
|
MIS15-00292
| ELE-Final | 11/18/2015 | 11/18/2015 | 11/18/2015 2:07:30 PM | P | DONE |
|
|
as per Chad S-ele, plm & structural work being done w/o permits Knocked on door and no answer. Left correction and do not cover electrical wiring on window.
|
ELE13-01291
| Electrical Rough-In | 11/18/2015 | 11/18/2015 | 11/18/2015 1:40:32 PM | P | PASS |
|
|
Contact Frank for site work underground. Phone #: ###-#### Inspection requested via web by Tom Betty r/i continue slab on slab ground level conduits ( rock climbing area) ok
|
ELE13-00983
| ELE-Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 11:29:54 AM | | DONE |
|
|
talked to Terry and he will scedule final
|
ELE15-03243
| Final | 11/16/2015 | 11/18/2015 | 11/18/2015 11:18:13 AM | A | PASS |
|
|
Carlos Phone #: ###-#### final ok perm. occupancy ok
|
ELE15-03562
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 11:06:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams final ok for new loadcenter and rtu's and rooftop conv. outlets
|
ELE15-03561
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 11:04:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams final ok on new loadcenter, 2 rtu's and conv outlets on roof
|
ELE15-02823
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 10:48:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams final ok for house panel and branch cicuitry from it, including rooftop ,,exterior lights and receptacles, bathrooms and fire alarm power
|
ELE15-03563
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 10:44:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams final ok
|
ELE15-03560
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 10:40:46 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams bahtrooms and exterior fixtures not trimmed out
|
ELE15-03238
| Final | 11/18/2015 | 11/18/2015 | 11/18/2015 9:50:51 AM | A | FAIL |
|
|
Please inspect the service sub-panel wiring ; GFCI circuits below those 2 panels. Re-using existing ground rod ; water pipe grounding beyond the existing service location. (Please let me know if I need to feed the 125A breaker from the load side of the 200A breaker inside the Meter Main panel. It was wired internally different than I expected so what you see is not what I originally envisioned.) Phone #: ###-#### Inspection requested via web by nathan palmer NOTES: 4/0 ser ok IF not surrounded by insulation in ceilig. OK to insulate walls only for the short run as per 338.10(4) and 310.15(2). Confirm and expose location of existing grounding electrodes and conductors or add 2 ground rods as per NEC 250.52(5). Install intersystem ground termination bar as per 250.94. Confirm buss rating for 125amp breaker installed in service equipment. Not clear on label on panel door. Install plastic bushings on romex connectors with conductors larger than #4.. Needed p/s today, not final
|
ELE15-03238
| Permanent Service | 11/18/2015 | 11/18/2015 | 11/18/2015 9:43:44 AM | P | PASS |
|
|
Please inspect the service sub-panel wiring ; GFCI circuits below those 2 panels. Re-using existing ground rod ; water pipe grounding beyond the existing service location. (Please let me know if I need to feed the 125A breaker from the load side of the 200A breaker inside the Meter Main panel. It was wired internally different than I expected so what you see is not what I originally envisioned.) Phone #: ###-#### Inspection requested via web by nathan palmer p/s o/h rec ok
|
ELE15-03073
| Final | 11/17/2015 | 11/18/2015 | 11/18/2015 8:25:24 AM | A | PASS |
|
|
call steve with questions Phone #: ###-#### Inspection requested via web by Don Lustig final ok
|